PART II- TRANSPORT RELATED INFRASTRUCTURE REHABILITATION PROJECTS

TABLE 1- COMPLETED TRANSPORT REHABILITATION PROJECTS DURING 1993 -2003

Project Name

Project Natural / Location

Financial Sources

Commencement and Completion Dates

Roads:
Rehabilitation of Bridges along RN5 & 6 New construction of 11 bridges along RN 5 & 6 (RN 6-6 bridges: RN5 -5 bridges)

Grant form Australia

1993 – 1995

SRAL Project Rehabilitate of some national roads and railway in Cambodian, and supply of equipment to Phnom Penh

Soft Loan form ADB

1993 – 1996

Rehabilitation of NR 6A, 44.5 km Rehabilitate and upgrade RN6A from Phnom Penh to junction RN61 & RN6

Grant from Japan

1994 – 1995

Rehabilitation of NR 4, 236km Rehabilitate and upgrade RN4 from Phnom Penh to Sihanoukville

Grant from USA

1994 – 1995

Restoration of Chroy Chang Wa Bridge Rehabilitate Chroy Chang Wa bridge which was destroyed during civil war

Grant from Japan

1994 – 1995

Odem Heavy Equipment Center Project Build new workshop and supply of 4 heavy equipment brigades

Grant from Japan

1994 – 1996

Rehabilitation of NR6 & 7 km, 74.5km Rehabilitate and upgrade RN6 and 7 from end of RN6A to Kompongcham

Grant from Japan

1997 – 1999

New Mekong Bridge Construction, Kizuna Bridge New bridge construction across Mekong river at Kompongcham province along NR7

Grant from Japan

1998 – 2001

Rehabilitation of NR7, 12km Rehabilitate and upgrade RN7 from to Kizuna bridge to junction RN7 & RN11

Grant from Japan

2000 – 2003

Bridge Restoration Project along RN6A Reconstruct three bridges (Bridges No. 24, 25 & 26) along RN6A

Grant from Japan

2000 – 2003

Rehabilitation of RN6, 17.5km Rehabilitation and upgrade RN6 from Siem Reap to Prey Rolous

Grant from Japan

2000 - 2002

Rehabilitation of RN5, 91 km Rehabilitation and upgrade RN5 from Phnom Penh to Kompongchhnang

National Budget

2000 – 2002

ADB Loan 1824-CAM (SF):Flood Emergency Relief Project, Part A, Transport Sector, 449 km Rehabilitation of RN damaged by the floods of 2000 and 2002:
  • RN 1: section of RN 1 from Phnom Penh to Neak Leung and 4 bridges, 10km
  • RN2: from PK11 to PK 78, 67km and 1 bridge
  • RN5 from Kompongchhnang to Krakor, 80 km & from Battombang to Sisophon, 45 km
  • RN6: from Skun to Kompongthom, 88.2 km
  • RN 11: from Neak Leong to junction RN 11 & RN7, 91km and 14 bridges
  • RN21: 30 km of road section and 1 bridge
  • RN 71 from Treung to Chamkaleu, 33.6 km
  • Part of Railway route and structure
  • Soft Loan from ADB

    2000 – 2004

    Port:
    Phnom Penh Prot Project Build new terminal berth and supply of equipment

    Grant from Japan

    1994 – 1996

    Phnom Penh Floating Port Build new 2 floating ports and supply of equipment

    Load from World Bank

    1995 - 1997

    TABLE 2- ON-GOING TRANSPORT REFIABILITATION PROJECTS

    Project Name

    Project Nature / Location

    Costs

    Financial Sources

    Commencement and Completion Dates

    Roads:
    ADB Loan 1697-CAM (SF) — Primary Roads Restoration Project, 405 km

    Rehabilitate and upgrade RN 5, 6 & 7:

    RN5: from Krakor to Battombang,

    RN6: from Kompongthom to Prey Romeas
    RN7: from Junction RNs 11 & 7 to Kratie

    US$ 88 mil.

    Soft Loan from ADB OPEC, Australia

    2000 - 2005

    ADB Loan No. 1659-CAM (SF): Phnom Penh- Ho Chi Minh Highway Project, 105 km Rehabilitate and upgrade RN 1 from Nak Loeng to Cambodia-Viet Nam Boarder

    US$32 mil.

    Soft Loan from ADB

    1999- June 2005

    Emergency Flood Rehabilitation Project, 270.5 km Rehabilitate RN3, RN33, RN31 & RN61

    US$ 12 mil.

    Soft Loan from World

    Bank

    2000-2004

    Credit No. 3181 -KH Road Rehabilitation Project, 140 km

    Rehabilitate and upgrade RN6, RN3,

    RN51, Phnom Penh & Siem Reap

    Municipal Roads

    US$ 42 mil.

    Soft Loan from World

    Bank

    2000-2004

    ADB Loan 1945-CAM (SF): Cambodia Road Improvement Project

    Rehabilitate and upgrade RN 5 & 6 from

    Poi Pet — Siem Reap, 150 km; and

    Structure on RN 56 and 68

    US$ 87.5 mil.

    Soft Loan from ADB & OPEC

    2004 -2007

    Rehabilitation Project of National Road No. 7

    Rehabilitate and upgrade RN 7 from Kratie

    to Cambodia - Lao Boarder, 196 km

    520 mil Yon
    (US$ 65 mil)

    Soft Loan from People Republic of China

    2004 - 2008

    Kompot- Trapangropeou Road Rehabilitation Project Rehabilitate and upgrade RN 3 from Kompot Town to Trapangropeou, 32.5 km

    US$ 19 mil

    Soft Loan from South Korea

    2004-May 2007

    Koh Kong —Sre Ambel Road Improvement Project Rehabilitate and upgrade RN 48 from Koh Kong to RN4, 152 km

    867.8 mi Bath
    (US$ 22 mil.)

    Soft Loan from Thailand

    2004 -2006

    Provincial and Rural Infrastructure Project Rehabilitate and upgrade selected national roads in 4 northern provinces of Cambodia, Siem Reap, Kompongthom, Odormeanchey and Pravihear app . 800 km

    US$ 20 mil (US$ 12 mil. MPWT; US$ 8 mi. – MRD)

    Soil Loan from World Bank

    2004 – 2008

    Road Rehabilitation RN2 Orchambok - Cambodia/ VN boarder Rehabilitate and upgrade RN2 from Takeo town to Cambodia-Vietnam Boarder

    US$ 12.4 mil

    Japan Counterpart Fund

    2003 – 2005

    Port:
    1st Emergency Rehabilitation Project of Sihanoukville Port Build 240m- container terminal berth, stacking yard, inspection building, water supply & fence, and supply of generator set

    JPY 4,142 mil. (US$ 39,4 mil.)

    JBIC Soft Loan No. CP-P3

    2003 – March 2005

    Railway:
    Supply Project of rail stock & locomotives Supply of rail stock & locomotives

    US$ 13 mil

    National Budget

    2003 – 2005

     

    TABLE 3 – TRANSPORT REHABILITATION PROJECTS IN PIPE LINE

    Project Name

    Estimation Cost

    Expected Financial Sources

    Expected Commencement and Completion Dates

    Remarks

    Road:
    Rehabilitation Project of RN 68 from RN6 (Kralanh) to Cambodia - Thai border, 117 km excluding structure

    US$ 26 mil

    Soft Loan from Thailand

    2006 – 2008

    Letter of request for soft loan was sent to Royal Thai Government in November 2004

    Rehabilitation Project of National Road No. 67 from Siem Reap Town to Cambodia – Thai border, 132 km

    US$ 45 mil

    Soft loan from Thailand

    2005 – 2007

    100 mil. Bath was granted for the on-going project study; and load is expected in 2005

    Kompot- Phnom Penh NR3 Rehabilitation Extension Project, 148 km

    US$ 60 mil

    Soft Loan from South Korea

    2006 - 2008

    Letter of request for loan was sent to South Korean Government in November 2004

    Project of Four Bridges Along RN 48

    300 mil Bath (US$ 7.5 mil.)

    Grant from Thailand

    2005 - 2007

    Civil Work Bidding is in Process

    Three Bridges at Kondal Province, Takhmao

    JPY 848.2 mil US$ (7.75 mil.)

    Grant from Japan

    19 months

    • Detail Design Study Completed

    Rehabilitation Project of NR 1 from Phnom Penh to Nak Leung includes 2nd National Mekong bridge, 61 km and asphalt concrete overlay o(NR6A & 7 from Phnom Penh to Kompongcham Town, 124 km

    (US$ 170 mil.)

    Grant from Japan

    2006-2008

    Study completed; Constrain is resettlement

    RN78 Road Rehabilitation Project

    US$ 25 mil.

    Loan from Vietnam

    2005-2008

    Detail Design Study is in progress

    Port:
    2nd Phase of Sihanoukville Port Extension Project to extend container terminal berth and equipment supply

    JPY 4,313 mil (US$ 40 mil)

    Soft Loan from JBIC

    2005-2007

    Loan signing end of November 2004

    Railway:
    Rehabilitations of Missing Link between Poi Pet and Sisophon, 48km

    US$ 22 mil

    Soft Loan from Malaysia

    2006 – 2007

    • Feasibility Study completed

    • Malaysia Government donate 106km of used rail tracks

    • To be confirmed by Malaysia

    TABLE 4 – TRANSPORT REHABILITATION PROJECTS PLANED FOR THE YEAR 2006 - 2010

    Project Name

    Estimation Cost

    Expected Financial Sources

    Expected Commencement and Completion Dates

    Remarks

    Road:
    Rehabilitation of RN 57 from Battombang to Cambodia – Thai border, 94 km

    US$ 38 mil.

    Grant from Japan

    2007 – 2010

    To be confirmed by Japan
    Rehabilitation of RN33, RN72 and RN56, 130km

    US$ 40 mil

    Soft Loan from ADB

    2006 – 2009

    To be confirmed by ADB
    Rehabilitation of RN 66 from Siem Reap to Stung Treng include 3rd Mekong bridge ant Stung Treng, 200 km

    US$ 110 mil

    Soft Loan from ADB

    2007 - 2010

    To be confirmed by ADB
    Rehabilitation of RN 76 from Snoul to Mondulkiri and Ratanakiri, 305 km

    US$ 92 mil

    Soft Loan from ADB

    2007 – 2010

    To be confirmed by ADB
    Port:
    New Construction of 300m-Berth for Bulk Cargo and Supply of Berth Associated Equipment

    US$ 36 mil

    BOT Project is acceptable

    2006 – 2010

    The project include also stacking yard of app. 12 hectare
    New Construction of 265m-Berth for General Cargo and Dredging of Approach Channel

    US$ 10 mil

    Sihanoukville Port Authority

    2006 – 2008

    The project also includes quay apron of 8,000 sp.m
    Sihanoukville Free Industrial Zone Project

    US$ 28 mil

    Sihanoukville Port Authority

    2005 – 2008

  • Feasibility Study completed by JICA

  • Project will provide jobs to 10,000 employees

  • Upgrade Phnom Penh Dry Port Project

    US$ 1.5 mil

    Sihanoukville Port Authority

    2006 -2010

    The project includes build new railway access to Phnom Penh Dray Prot, strengthening management capacity and environment mitigations
    Rehabilitation of Existing Cargo Berth

    US$ 1.0 mil

    Sihanoukville Port Authority

    2007 – 2008

    The existing cargo berth will be rehabilitated and modified to passenger berth
    Environmental and Anti-terrorist Protection Project

    US$ 5.0 mil

    Sihanoukville Port Authority

    2005 – 2006

    • The project aims at supply the port authority with anti-terrorist protection equipment and strengthening capacity of port in anti-terrorist protection program

    • The project also includes strengthening port authority with oil spilt protection program

    Sihanoukville Wind Power Project

    US$ 1.0 mil

    Sihanoukville Port Authority

    2005 – 2006

    Supply of environmentally friendly energy to Sihanoukville Port Authority
    Procurement Project of Phnom Penh Prot Fixed Crane

    US$ 3.0 mil

    Seeking

    2005

    Two fixed crane are required to cope with the increase of container cargo and to improve efficient operation
    Phnom Penh Inland Container Depot Development Project

    US$ 7.0 mil

    Seeking

    2005 – 2007

    Existing Phnom Penh Port site at PK 5 need an upgrading and development to cope with cargo increase
    Phnom Penh Inland Container Depot Development Project

    US$ 5.0 mil

    Seeking

    2005 – 2007

    Phnom Penh Inland Container Depot Development sites of 3 locations at Takhmao along Bassac River, Prek Anhchanh, at Kampongcham along Mekong River are required to cope with cargo increase
    Dredging river bed along the Mekong River

    US$ 4.5 mil

    Seeking

    2004 – 2007

    Dredging River bed along Tonle Sap River

    US$ 21 mil

    Seeking

    2004 – 2007

    Supply of two harbor tugboats with capacity of 550 hp

    US$ 1.5 mil

    Japan Grant

    2004 – 2007

    Rehabilitation of River Port

    US$ 6 mil

    Japan Grant

    2005 – 2007

    Railway:
    Rehabilitation of Railway between Sisophon-Phnom Penh, 338km

    US$ 40 mil

    ADB

    2006 – 2009

    • Feasibility Study completed by KL Consult Malaysia and Halcrow Thailand

    • Discussion on fund is going on/to be confirmed by Thai Government

    Rehabilitation of Railway between Phnom Penh-Sihanoukville town 264 km

    US$53 mil

    Seeking

    2006 – 2007

    • Feasibility Study completed by Japan railway Technical Services in 2000

    • US$53.4 mil in total (1st phase – US$ 11.4 mil & 2nd phase – US$ 42 mil)

    Construction of new railway link between Phnom Penh (Bat Deung) and Loc Ninh (Viet Nam)

    Us$ 500 mil

    Seeking

    -

    Feasibility Study on Tran-Asia Road and Rail Project completed by Malaysian Transport Ministry

    TABLE 5 – TECHNICAL ASSISTANCE PROJECTS IN PIPE LINE

    Project Name

    Estimation Cost

    Expected Financial Sources

    Expected Commencement and Completion Dates

    Remarks

    Adoption of Cambodia Road Standard Project

    US$ 0.15 mil

    Grant from ADB

    2005

    To be confirmed by ADB
    National Road Master Plan Project

    -

    Grant from Japan

    2005 – 2007

    Project Preparatory Study completed in November 2004
    Regional PPTA for RN 33

    US$ 1.2 mil (Cambodia & Vietnam)

    Grant from ADB

    2005

    To be confirmed by ADB
    Railway Master Plan

    US$ 0.5 mil

    Seeking

    2005

    Project Preparation Study of RN 78 from VB-Cambodia border to Rattanakiri and from Rattanakiri to Stung Treng, 189 km

    -

    Grant from Vietnam

    2005

    Technical Study is in process

    TABLE 6 – TECHNICAL ASSISTANCE PROJECTS PLANED FOR THE YEAR 2006-2010

    Project Name

    Estimation Cost

    Expected Financial Sources

    Expected Commencement and Completion Dates

    Remarks

    Master Plan for Waterborne Transport on the Mekong River System

    Euro 0.75 mil

    Belgium Govt

    2005 – 2006

    To be confirmed by Belgium Govt
    Waterway Management Transport and Navigation Safety Implementation Program

    US$ 0.15 mil

    Grant from ADB

    2005 – 2006

    To be confirmed by ADB
    Finalization of Road Law (Acts) & Road Safety Program & HR

    US$ 0.5 mil

    Grant from WB

    2005 – 2006

    To be confirmed by WB

    TABLE 7 – IMPLEMENTATION PROGRAMS FOR LAND, MARITIME AND WATERWAY TRANSPORT

    Project Name

    Estimation Cost

    Expected Financial Sources

    Expected Commencement and Completion Dates

    Remarks

    Land Transport:
  • Formulation of law and regulation on road traffic, transport of goods, passengers and public parkings
     
  • Strengthening road traffic safety
  • US$ 37.4 mil

    Seeking

    2004 - 2008

    Maritime Transport:
    • Development maritime codes, legal instruments and ship registration acts
       
    • Development of Master Plan for maritime transport and maritime policies
       
    • Establishment of mechanism for controlling and monitoring
       
    • Improve performance and capability

    US$ 7.3 mil

    Seeking

    2005 – 2008

    Waterway Transport:
  • Formulation of legislations, regulations and rules on management of waterway transport and navigation safety
    • Information, promotion and cooperation
       
    • Formulation of legal framework for cross-border navigation

    US$ 1.2 mil

    Seeking

    2004 - 2008

    TABLE 8: ROAD MAINTENANCE

    Description

    Funding USD

    Years

    Sources

    Remarks

    Maintenance of 4,189 km of National and Provincial Rehabilitated Roads (literate roads)

    86 mil

    2004 – 2008

    Seeking

    Routine Maintenance of 2,500 km of National and Provincial Roads (bituminous road)

    60 mil

    2004 – 2007

    Seeking

    Maintenance of National Roads: RN6, RN8 and RN 53

    23 mil

    2004 – 2008

    Seeking

    TABLE 9: SUMMARY OF COSTS

    Description

    Budget / US$ Million

    Remarks

    Committed

    492.3

    On-going Transport Rehabilitation Projects

    Non-committed

    739

    (1)

    Seeking

    845

    (2)

    Total Budget for the year 2006 – 2010

    1,584

    (1+2)