Prepared by
Cambodian Rehabilitation and Development Board
Council for the Development of Cambodia
DECEMBER 2015
|
Acknowledgement
The sources of information
used in preparing this Mutual Accountability and
Partnerships for Results are the reports on TWG
strengthening exercise and JMI progress report prepared
by all Technical Working Groups (TWGs). The great
efforts of all TWG Chairs, focal points and lead
development partner facilitators is therefore
acknowledged on the record with gratitude and it is
hoped that the Report will be used in their future work.
In all cases CRDB has attempted to validate the data and evidence to confirm the factual basis for the analysis that has been presented.
|
TABLE OF CONTENTS
Acronyms
1. Introduction.......................................................................................................................................... 1
2. Technical Working Group
Performance............................................................................................. 1
TWG Performance Review
Study.............................................................................................
1
TWG Strengthening Exercise
..................................................................................................
2
Common actions/general recommendations............................................................................
2
Specific actions........................................................................................................................
3
3. Progress on
Implementation of the JMIs........................................................................................... 7
Core of the RS
- Phase
III: Good governance.........................................................................
7
Side 1 of the RS:
Promotion of the Agriculture Sector.............................................................
9
Side 2 of the RS:
Development of Physical Infrastructure......................................................
10
Side 3 of the RS: Private
Sector Development and Employment...........................................
10
Side 4 of the RS: Capacity
Building and Human Resource Development..............................
10
4.
Conclusion.............................................................................................................................................. 16
LIST OF TABLES
1.
Summary of TWG Strengthening Exercise
Reports............................................................... 5
2.
Summary of JMI Implementation Status.................................................................................
13
3.
TWG Performance Review: Survey Scoring Summary.........................................................
14
4.
2014 Funding and Development Partner Activity in TWGs....................................................
15
|
Acronyms
CDC
Council for the Development of Cambodia
CRDB
Cambodian Rehabilitation and Development Board
DCPS
Development Cooperation and Partnerships Strategy
(2014 - 2018)
DPs
Development Partners
GDP
Gross Domestic Product
JMIs
Joint Monitoring Indicators
LDC
Least Developed Country
LMIC
Lower-Middle Income Country
MDG
Millennium Development Goal
MoWA
Ministry of Women Affairs
NSDP
National Strategic Development Plan
NGOs
Non-Governmental Organizations
ODA
Official Development Assistance
PBA
Program-Based Approach
PFM
Public Financial Management
RGC
Royal Government of Cambodia
RS
Rectangular Strategy
SDGs
Sustainable Development Goals
TWGs
Technical Working Groups
UN
United Nations
UNFCCC
United Nations Framework Convention on Climate
Change
|
Efforts to promote results-based partnerships in
2014-2015 focused on strengthening the Technical Working
Groups (TWGs), serving as the principal mechanisms for
coordination and partnership dialogue. The Joint
Monitoring Indicators (JMIs) for 2014-2018 were prepared
to address both the 'managing for development results'
and the 'mutual accountability' principles of effective
development cooperation and set up medium-term goals
based on development outcomes articulating in the NSDP.
The TWG Performance Review Study,
finalized during the first Quarter of 2015,
addressed that the TWG architecture is generally sound
but performance is mixed and there are several areas in
which improvements should be made in line with joint
partnerships including shared learning and commitment
that promote individual TWG performance. To
follow-up on these findings, the strengthening of TWG
performance has been exercised where all
TWGs were requested to consider measures that can be
taken according to promote their performance and
results.
From a partnership perspective, the JMIs are one of the
principal tools employed to support the implementation
of the Development Cooperation and Partnerships Strategy
2014-2018. To secure improved performance through a
continuous and consistent focus on priority objectives,
a new set of sectoral JMIs was selected for the full
5-year 2014-2018 NSDP implementation period prior to
ratification by the Prime Minister. They are, however,
subject to an annual progress review and reporting to
CDC so that annual activities may be agreed to ensure
that targets remain on-track.
TWG Performance Review Study
In August 2014, the
Technical Working Group Performance Review Study by an
independent consultant was conducted to help strengthen
TWG performance in support of the Royal Government of
Cambodia's Rectangular Strategy III and the National
Strategic Development Plan 2014-2018 (NSDP). The TWG
architecture is an important cornerstone of the RGC's
Development Cooperation and Partnership Strategy (DCPS)
2014-2018 that aims to promote and strengthen aid and
development effectiveness. The results of the study were
then discussed and verified at the Partnerships &
Harmonization (P&H) Meeting on 27 January 2015 at the
Council for the Development of Cambodia (CDC). This
represents the first step in implementing the DCPS by
providing clear direction for the TWGs to reflect on
their own work as well as to present an opportunity to
produce a general overview and a set of recommendations
that can help them with their shared learning that
promotes individual TWG performance.
The TWG Performance
Review Study's main findings include:
-
The TWG architecture is generally sound but
performance (i.e., implementation) is mixed. As a
result TWG contributions to achieving sector
objectives and national development goals, including
aid effectiveness and public sector reforms, is
uneven. RGC Chairs and Secretariats tend to view the
overall performance of TWGs higher than do the DP
Lead Facilitators (Table 3).
-
TWGs that perform well over time tend to exhibit a
mix of common factors. These factors include: strong
government ownership; committed leadership by the
Chair; active commitment and support from DP Lead
Facilitators; sound managerial capacity; high levels
of trust and good communication; strong
secretariats; clear Terms of Reference, sector
development plans and strategies; annual TWG work
plans; regularly scheduled and well managed plenary
meetings; active sub-groups; self-initiated TWG
retreats and reviews; and considerable time and
effort on the part of all stakeholders.
TWGs also face a
number of challenges and constraints that can impede
good performance. First, there is lack of
an over-arching
accountability framework to monitor and evaluate
|
-
performance. Second, in some TWGs certain development
issues have become increasingly contentious, while in
other TWGs shifting circumstances are changing
stakeholder perceptions of development priorities.
Third, aid and investment modalities are changing and
new development actors are emerging. Fourth, the quality
of participation by TWG members, both RGC and DPs, is
inconsistent. Fifth, plenary meetings often have agendas
that are so crowded they preclude dialogue concerning
both technical and policy issues.
The TWG Performance
Review Study made six recommendations for strengthening
TWG performance in the short and medium term:
-
Full implementation of the Development Cooperation
and Partnership Strategy, 2014-2018.
-
Second, the TWG P&H, along with the CDC as Chair,
should play a more active role in providing
leadership for the overall TWG infrastructure.
-
The CDC should play a more active role in ensuring
that TWGs are accountable to a higher authority for
performance and progress toward JMIs.
-
The TWG landscape in terms of the number and sector
coverage should be rationalized.
-
The CDC along with the TWG P&H should encourage TWGs
to assess how well they perform each function and
identify areas and plans to strengthen core
functions.
-
The Guideline on the Role and Functioning of the
Technical Working Groups (October 2010) should be
reviewed in light of the new development context and
aid modalities.
TWG Strengthening Exercise
Sixteen of the 19
TWGs completed the Strengthening Exercise that have been
consolidated and assessed by CDC for use by all
development actors (a summary is provided in Table 1).
All the TWGs that reported have prepared and discussed
the reports through consultative processes either at the
TWG meetings or retreats before endorsing by both Chairs
and DP Lead Facilitators. By identifying recommendations
for both common and specific actions as well as
highlighting good practices, it is intended that this
learning and sharing will inform dialogue and decisions
that will promote effective development and partnership
actions.
The findings of the
Strengthening Exercise conducted by the 16 TWGs have
shown similar recommendations. There are many
recommendations that apply generally for all TWGs as
well as some unique actions to be taken by individual
TWGs (a summary is provided in Table 1).
Common
actions/general recommendations
Overall, based on
the reports submitted, general recommendations have been
proposed to improve the TWG performance. These have been
incorporated into the revised TWG Guideline and include
the followings:
-
Conducting regular meetings, based on an agreed
schedule, that are facilitated by an effective Chair
with ownership respected by all members, with
well-thought-through agenda and concrete action
points for implementation and follow-up;
-
Clear Terms of Reference is needed for each TWG.
Thus, all TWGs reported mentioned a need to draft,
revise or update the TWG ToR (to include the role of
the Secretariat) for better functioning of the TWG
and Secretariat in response to the changing
Cambodia's development context and the TWGs' roles
and functions;
-
Effective communication mechanisms are needed for
regular and timely information-collecting and -sharing
between members;
-
Intensify policy dialogue at the TWG level to discuss
key policy items and challenges so that key policy
decisions are made to ease the implementation on the
ground;
-
To revise the ToR and membership of sub-groups and
delegate topics to these technical sub-groups that can
meet informally and report to the main TWG;
-
Continued capacity building and strengthening of the
secretariat and TWG in coordination, conduct of
meetings, dialogues and negotiations, Monitoring and
Evaluation, and sub-national supports has been generally
raised by most TWGs;
|
-
Review and update JMIs, as needed, and provide a
follow-up mechanism to ensure progress is made based on
a clear set of goals linked to RGC policy;
-
The roles of CDC proposed by other TWGs are consistent
with the DCPS and include the followings:
-
To provide extra leadership on
clustering/rationalizing existing TWGs around
thematic frameworks for institutional reforms and
capacity development;
-
The P&H TWG to join TWG working relationships
through organizing ''policy seminars'' or ''thematic
retreats'';
-
To play a more pro-active advisory role to TWGs,
advising for better functioning of TWGs, and act as
a resource center, including enabling exchanges of
lessons and experiences among TWGs and providing
updates on aid/development effectiveness knowledge,
forums for networking and sector's donor mapping of
sector (annually);
-
To further promote TWG capacity on the ODA Database
system, PBA, results-based framework, the use of
country systems through ''clinics'' and TWG meetings
and retreat;
-
To play a catalyst role in monitoring the
implementation of the TWGs' Action Plans and the
progress of the JMIs;
-
To assist TWGs in addressing the inter-ministerial
coordination and cross-cutting issues, which are one
of the most challenging problems for almost all
TWGs. Most TWGs proposed GDCC as a forum for
discussion on these as well as for reactivating the
mutual accountability mechanism it foresees.
Specific actions
For some TWGs like
LJR and PAR, to regain momentum, trust and support for
their TWGs is critical for the revitalization of the TWG
roles and functions. Re-engaging DPs is also necessary.
These TWGs see the importance of this and so will
prepare the TWG Work/Action Plans to communicate a
concrete plan for implementation of the reforms.
Other TWGs,
including Agriculture and Water, Forestry Reform,
Fisheries, Land, Mine Action and HIV/AIDS raised the
significant roles of NGOs and/or private sector in the
TWG work. They suggest possibilities to include the
representatives of these groups in the membership of
their TWGs. This will be enabled by reviewing the
composition of the TWG, together with that of the
sub-groups. Moreover, two TWGs in particular RWSSH and
Gender encourage enhanced harmonization among DPs and DP
lead facilitators to agree on main issues among
themselves before meeting with the TWG. Uniquely, for
TWG-IRI, attracting new donors supporting the
infrastructure sector, including China and other
non-traditional donors, is one key factor contributing
to the TWG better performance; while TWG-RWSSH indicates
a need for an annual donor mapping exercise to identify
the different interventions and approaches implemented
by stakeholders and to track information on off-budget
support to the RWSSH sector. CDC support has been
requested for this exercise and CDC has responded
through enhanced reporting on TWG support by DPs being
made available in its ODA trends analysis (Table 4 on
page 15).
Cross-cutting
issues and inter-ministerial coordination have been the
center of attention for many TWGs. These include those
working on the public service reforms: LJR, PAR and D&D,
on the sensitive issues like land, on agriculture and
related sectors like A&W, FR, Fi, and on gender
mainstreaming. TWG-LJR and PAR identify a need to set up
a mechanism to intensify dialogue between existing
cross-sectoral coordination mechanisms. Specifically,
TWG-PAR will identify joint objectives and activities
with MEF and NCDD-S and other line ministries working in
key service delivery areas in order to create synergies
in mobilizing additional supports for Public
Administration Reform. TWG-D&D sets out to increase
engagement by line ministries in the work of
Sub-national Democratic Development by inviting them to
represent and share experiences together with progress
with respect to their activities in the areas of SNDD
reform. For TWG-A&W, TWG-FR and TWG-Fi, there has been a
consensual recommendation for a more cross-sectoral
coordination, timely information-sharing and increased
links between sector/thematic policies and work of the
three sectors and TWGs. Concrete actions include an
update of the Strategy on Agriculture and Water;
harmonization among the three sector strategies and
program/project development; a need for an improved
policy dialogue among the three TWGs at an annual
seminar/joint session on common issues; and a better
engagement between MAFF, FA and FiA.
Similarly,
TWG-Gender, responsible for a sector that is very much
of cross-cutting issues, proposes a few unique actions
for itself. First is to make improved use of sub-groups.
These will be used to discuss technical issues and
report results to the main TWG meeting every 2 years.
The TWG will also establish a gender mainstreaming
agenda for the MoWA representatives to take forward in
each TWG they sit in and invite line ministries to send
a representative to the TWG to report on gender in their
own sector. MoWA will set up a common M&E framework for
NR4 for its final report in 2018.
Financing and
resource mobilization and capacity at sub-national level
is a critical issue for a number of TWGs: Fisheries,
Health, HIV/AID and RWSSH. Different measures have been
and will be done to address a number of issues, such as
capacity strengthening, service deliveries, facilitation
of roles and functions of TWGs at the provincial level.
The approach taken includes peer learning and exchanges
of experience and provision of trainings, efforts to
mobilize resources including for the local and commune
budget, and improved communication lines between the
national and sub-national levels.
TWGs like Education
and Health, having the necessary criteria for
well-functioning TWGs, focus more on the strengthening
roles and functions, as well as performance, of the
Sub-groups in regard to technical issue discussion.
TWG-Education plans to work towards more coherence and
harmonization among sets of indicators to monitor
results in the Sector. This entails the creation of a
common monitoring framework that makes reference to the
Education Strategic Plan, Budget Strategic Plan and
Annual Operational Plan, and the TWG-Education JMI.
TWG-Health, similarly, continues bringing the
Sub-TWGH representatives to the TWG meeting to ensure
linkages, information-sharing and reporting.
Having been aware
of the issues that would be raised regarding the
expanded roles of CDC and P&H, the TWG has planned a
number of measures. The TWG clustering could also help
ease the cross-sectoral policy dialogues and
coordination. TWG are technical bodies accountable and
support their host ministries to attain desired results.
To better provide clear guidance on the roles and
functions of TWGs, CDC has prepared and finalized the
2015 TWG Guideline, with comments and suggestions from
TWG Chairs, DP Lead Facilitators and the TWG-P&H
members. The Guideline, together with the review of
these Strengthening Exercise results of all TWGs, was
discussed at a meeting of the TWG Network in September
2015. Last, CDC is preparing a work plan and schedule of
the TWG-P&H meetings, which are linked to the
implementation of the DCPS.
|
Table 1. Summary of the Strengthening Exercise Reports
submitted by TWGs
TWG
|
Methods
of the exercise
|
Main findings/recommendations
|
Common actions
|
Specific actions
|
LJR
|
TWG retreat
|
To have regular meetings (at least quarterly);
conduct annual sector retreat to review
results; and, if necessary, ad-hoc meetings
should be convened,
with well-thought-through agenda and
concrete action points for implementation and
follow-up;
To prepare/revise/update clear ToRs of the TWG
and secretariat, as well as work plan or action
plan, in line with the CDC TWG Guideline;
To revise the ToR and membership of sub-groups
and delegate topics to these technical
sub-groups that can meet informally and report
to the main TWG;
To review and update the JMI;
To set up/enhance effective communication
mechanisms are needed for regular and timely
information-collecting and -sharing between
members;
To intensify policy dialogue at the TWG level to
discuss key policy items and challenges so that
key policy decisions are made to ease the
implementation on the ground;
To build/strengthen capacity of the secretariat
and TWG in coordination, conduct of meetings,
dialogues and negotiations, Monitoring and
Evaluation, and sub-national supports has been
generally raised by most TWGs;
To request CDC to provide extra leadership on
clustering/rationalising existing TWGs around
thematic frameworks for institutional reforms
and capacity development; through the P&H TWG to
join TWG working relationships through
organizing
''policy seminars''
or
''thematic
retreats''; to play a more pro-active advisory
role to TWGs, advising for better functioning of
TWGs, and act as a resource centre, including
enabling exchanges of lessons and experiences
among TWGs and providing updates on
aid/development effectiveness knowledge, forums
for networking and sector's donor mapping of
sector; to further promote TWG capacity on ODA
Database system, PBA, results-based framework,
the use of country systems through
''clinics''
and
TWG meetings and retreat; and to play a catalyst
role in monitoring the implementation of the
TWGs'
Action Plans and the progress of the JMIs;
To address the inter-ministerial coordination
and cross-cutting issues, and GDCC could be a
forum for discussions on these as well as for
reactivating the mutual accountability mechanism
it foresees
|
Regain momentum and trust on the TWG
Revise and update the Plan of Action from 2005
to mobilise support and set out a concrete plan
for implementation
Update/revise the list of membership
Improve effectiveness of the secretariat;
financial support and capacity building measures
are needed
Conduct a workshop to review the Legal and
Judicial Reform Documents and update the Plan of
Action (June 2015)
|
PAR
|
TWG meeting
|
Re-engage DPs to support and mobilise additional
resources for PAR as a strategic and medium-term
decision
Set up an institutional mechanism to intensify
dialogue between existing cross-sectoral
coordination mechanism
Identify joint objectives and activities with
MEF, MOIINCDD-S and line ministries in key
services delivery areas
Further develop capacity including performance
management, e-government, and other advanced HR
management
|
D&D
|
TWG meeting
|
Increase engagement by line ministries by
inviting them to present and share
experiences/progress in TWG meetings
Organise sub-committees based on the three JMIs
for the SNDD reform
Agree on Action Points at the conclusion of each
TWG meeting and include a follow-up of progress
|
P&H
|
TWG meeting
|
Sub-groups to consider DCPS themes (PBAs);
Seminars to address cross-sectoral and
cross-cutting issues
Revitalise support to other TWGs (social;
economic; and cross-cutting clusters)
A meeting of the TWG Network will be used to
review TWG work and DCPS implementation
Review and revise the TWG Guideline during Q3 of
2015.
Prepare a work plan and schedule of TWG meetings
linked to DCPS.
Strengthen leadership and capacity in other TWGs
is the main factor.
|
AW
|
TWG meeting
|
Maintain the participation of current NGO
members; to engage more with the private sector
Revisit/update the Strategy on AW and establish
task forces and/or subgroups as per recognised
needs
Identify agenda items that reflect agriculture
as a sector rather than as a ministry mandate
Encourage a more active sharing of information
and debate on agricultural water (irrigation)
issues
Improve cross-sectoral coordination, i.e.
between the TWG-AW and the two other TWGs on
Forestry and Fisheries
|
FR
|
TWG retreat
|
Hold an annual seminar among TWG-FR; TWG-Fi; and
TWG-AW on common issues
Improve alignment and harmonization among the
three sector strategies and program/project
development
Establish a forest development fund and other
funds supporting forest management
Strengthen M&E mechanisms, including staff M&E
capacity; strengthen institutional and human
capacity of the sector
Promote the use of PBA and country systems
|
Fisheries
|
TWG meeting
|
Review the membership of TWG and its sub-groups
in addition to revising ToR
Seek active participation of DPs involved in
economic development issues
Identify new tools to support dialogue between
members: web-based dialogue and document
repository platform
Better the engagement, communications and
information-sharing between FiA and MAFF through
TWG mechanism
Propose for a yearly joint session of the
TWG-AW, TWG-FR and TWG-Fisheries, for a global
review of the sector
Subjects related to sub-national fisheries
issues to be included in the TWG meeting agenda
For financing and resources for the sub-national
support, await the new structure, guided by the
new Fisheries Law
Strategic directions, TA and increase in RGC
budgetary contribution needed to support human
resource development
Strengthen the integrated FiA/DP M&E system;
reinforced link to regional initiatives/projects
in fisheries
|
Land
|
TWG meeting
|
Consider including the NGO representation of at
least 3 NGOs
Enhance partnership and harmonization with DPs
on aid and development effectiveness through the
agreed JMIs
Some areas for improvements in terms of meeting
arrangements, agenda and conducting of
preparatory meeting
Address the lack of commitment by members and
coordination and partnership between TWG-Land
and other TWGs
|
Mine Action
|
TWG meeting
|
Invite representatives of MEF and MFAIC to join
the TWG while maintaining the current NGO
members
Strengthen capacity of the TWG to deliver its
roles and functions
Conduct at least 2 TWG meetings per year and as
many sub-group meetings as required
|
IRI
|
TWG meeting
|
Enhance more participation from DPs
(particularly, China and other non-traditional
DPs in the sector)
Two DP lead facilitators, instead of one, should
be rotated in every two or three
The Secretariat of TWG-IRI should be transferred
to the General Department of Planning.
To enhance sustainability in producing the
transport overview, preparation role to be
transferred to MPWT
|
Education
|
TWG meeting
|
Review membership to include private sector, at
least at sub-working group where appropriate
Representatives from relevant line ministries
should invited to join the sub-sector working
groups
Strengthen performance of the Sub-groups,
including conduct of meeting
Further strengthen capacity of the secretariat
Increase more coherence between sets of Sector
indicators developed (ESP; BSP and AOP; JMI)
A follow-up mechanism needed to implement
decisions made at the TWG meeting
|
Health
|
TWG meeting
|
Continue the current composition and roles and
functions of the sub-groups
Improve communication on the status and progress
of policy proposals and decisions (by TWG
sub-groups)
Use the TWGH Secretariat meeting is more ideal
venue for selected policy discussion
Facilitate and strengthen the TWG functions at
the provincial level
Have Health Partner retreats to strengthen
coordination of HP's suggestions for the TWG
agenda and inputs;
|
RWSSH
|
Key informant interview;
Questionnaires;
Document review;
TWG meeting
|
Harmonise relevant key DPs in a more integrated
and coordinated way, facilitated by DP Lead
Facilitator.
High level meeting between Chair, Co-Chair and
some main DPs should be organized separately to
raise profile
In the process of re-organizing the sub-groups
(including roles and functions)
Start recruiting an assistant to the Secretariat
Conduct a review of all the major RWSSH
interventions to look deeper into their
approaches, for better alignment
Key policy items that are identified by
implementers as the constraint need to be
brought up and thoroughly discussed
Systematically track the resources flowing into
the sector to formulate NAP (CDC could provide
support in this regard)
Create a meaningful platform for functional
transfer to the sub-national level for some
parts of the TWG responsibilities
|
HIV/AIDS
|
TWG meeting
|
Review the membership and composition to include
private sector representatives in addition to
civil society
Review to strengthen the structure of the
TWG-HIV/AIDS as the number of partners working
on HIV is declining
Align Sub-TWGs with the Strategic areas of the
NSPIV
Discuss the need and opportunities to streamline
the various existing coordination mechanisms
(i.e. with TWG H)
Review to further improve overall aid
effectiveness and governance for the HIV
response when the NSPIV is available
Need to increase domestic resources for HIV
activities; efforts in mobilising is in the
process, including local/commune
Build capacity to coordinate the HIV responses,
conduct dialogues and for increased sub-national
governance capacity
|
Gender Equity
|
TWG meeting
|
Use Sub-groups for discussion on technical
issues (report results to the main plenary TWG
every 2 years)
Use TWG meetings for high-level policy issues
only
Encourage harmonisation among DP and CSO groups
before the TWG meeting
Play a more active role in aid coordination and
monitoring under the framework of NR4
Provide orientation and capacity building for
new members; a new co-facilitator for WEE and
one for Governance SG
Establish common M&E framework for NR4 for its
final report in 2018
Strengthen knowledge and capacity on how to
engender the SDGs and how to prepare for ASEAN
integration
Establish a gender mainstreaming agenda for the
MoWA representatives to take forward in each TWG
they sit on
Line ministries to send a representative to the
TWG-G to represent and report on gender in their
own sector
Develop a modality for joint monitoring and how
to support other TWGs related to gender
|
PPR
|
TWG meeting(partially discussed the Strengthening Exercise)
|
Develop clear TWG-PPR Work PlanTwo sub groups to update their ToR and share with the reporting team before end of March
To conduct two full TWG meetings a year (the first is during end of June; the second is in December)
Each sub-group to conduct regular quarter meetings and keep the co-chairs and co-facilitators updated and informed
To develop an agenda template for the meetings to track the progress and timeline for each activity agreed
|
PFM
|
No report received
|
|
PSD
|
No report received
|
|
SP,FS&N
|
No report received
|
|
|
|
3. Progress on
Implementation of the JMIs
The JMIs which are
based on principles of mutual accountability for
achieving development results provide a framework for
setting medium-term goals based on development outcomes
that have been prioritized in the Rectangular Strategy -
Phase III. They are therefore also closely associated
with priority targets defined in the NSDP and its
monitoring framework. Progress in implementing the 20
JMIs has been reported. Challenges encountered and
recommendations on any follow-up actions were also
elaborated in reports received from TWGs. Overall
progress has been encouraging (see Table 2), although
the speed and depth varies across priority areas.
Fourteen of the 20 JMIs reported on-going work with good
progress towards achieving targets by end 2015, while
six reported concern related to their JMI
implementation. These latter TWGs include TWG-D&D,
TWG-MA, TWG-Education, TWG-Health, TWG-RWSSH, and
TWG-HIV/AIDS. The progress in implementing the 20 JMIs
is reported in five sections, in accordance with the
priority areas of RS III, namely (i) good governance,
(ii) promotion of the agricultural sector, (iii)
development of physical infrastructure, (iv) private
sector development and employment, and (v) capacity
building and human resource development.
Core of the RS
- Phase III:
Good governance
The Legal and
Judicial Reform TWG (JMI 1) reported that overall there
is good promising progress made on the implementation of
activities leading to Output 1 (the dissemination and
enforcement of the three main laws concerning judicial
system) and Output 2 (the improved Case Management of
the new General Department for Court Organization and
the deployment of related new court staff at court
level). However, Output 3 on non-custodial alternatives
was report to have made only small progress. At least
two main challenges faced the TWG. These include: (i) a
need for a significant increase in the judicial budget;
and (ii) more opportunities for meaningful consultations
and engagement of relevant stakeholders. As a result of
this review, the TWG has been clear in setting out a
number of follow-up actions required for further success
in its JMI implementation.
For Public
Administration Reform work (JMI 2), targets have been
achieved. The National Program for Public Administrative
Reform (NPAR) 2015-2018 including an action matrix was
approved by the RGC. The NPAR's Action Plans have been
identified to achieve three following goals: (i) promote
the delivery of public service; (ii) strengthen human
resource management and development; and (iii) improve
the pay system. Since NPAR has already been approved
since January 2015 (Output Indicator achieved), the TWG
in 2015 has revised its targets upwards and work on new
output indicators and activities, with a specific focus
on jointly implementing NPAR with the other core
governance reforms in selected priority sectors.
The TWG-D&D (JMI 3)
reported that Output Indicator 1 (Subnational
Authorities (SNAs) collect at least 3% of their total
budget in the form of tax of non-tax revenue by 2015)
will not be met by the timeframe; however, this
indicator remains relevant, and so has been retained in
the design of the new implementation plan covering
2015-2017. The key challenge to progress remains a lack
of consensus within the General Directorates on the
Ministry of Economy and Finance regarding the issue of
own sources of revenue. The second output indicator on
the transfer of at least two important functions, staff
and resources by line ministries to SNAs remains
appropriate. Nonetheless, significant progress is needed
for it to be achieved by end-2015. The main constraints
to the transfer reported are reluctance of the
ministries; a need for Civil Service Reform to establish
the legal framework for SNA personnel including the
mechanisms for the personnel to be transferred from line
ministries to SNAs; a need for these issues to be dealt
with at the highest level of the government; and human
resource constraints within the NCDD-S. Moreover, all
preparations for implementing the Social Accountability
Strategic Plan have been completed. Since the main
implementation phase beginning in 2015, significant
progress has been made in resource mobilization with DPs
to support NGO demand-side activities; therefore, the
indicator is on-track to be achieved.
Further improvement
in budget comprehensiveness and transparency has been
reported by the TWG-PFM to be on-track and on-going.
Implementation of the second output on improvement in
financial accountability with a further improvement in
budget credibility and accountability line has also been
on-track (with domestic revenue collection increased by
1.45% in 2014, exceeding the target of 0.5% of GDP).
Work on the remaining indicators is still on-going. The
TWG also reported their on-going work toward having at
least 10 ministries implementing full program budgeting
and piloting budget entity (Output 3). A number of
challenges have been raised. Generally, these include a
lack of quality Budget Strategic Plans (BSPs)
preparation; unclear sub-programs; limited capacity for
revenue forecasting, cash planning and management in the
responsible institutions/agencies; and the complexity of
the program budgeting implementation. That said, better
partnership and cooperation, as well as the continued
firm support by line ministries/agencies, is essential
for the Public Financial Management Reform Program. The
TWG-PFM identifies a need to establish concrete
mechanisms in providing both necessary in-house and
outside trainings to relevant stakeholders.
The Partnership and
Harmonization TWG (JMI 5) reported mixed progress. Since
after the finalization of the Development Cooperation
and Partnerships Strategy (2014-2018), the share of ODA
using PFM systems and the procurement system shows sign
of improvement; however, the use of PBAs is actually a
little bit declined comparing to the baseline data. In
addition to the use of PFM systems, the aid on budget
also improved to 74% as information was provided by
development partners to the ODA Database for budgeting
purposes. This is due to the adoption of a different
methodology; the higher figure of 74% uses the data that
is provided through the ODA Database to MEF as part of
Budget formulation. This approach is felt to more fully
reflect the efforts of development partners to report
their projected disbursements to RGC via the ODA
Database, which are then shared with MEF, although not
always included in the Budget. Using the same
methodology as the baseline produces a figure of 17.2%.
The concern here is not that there has been a decline
but, rather, that donors completing the ODA Database
data entry are not sufficiently aware of what
information is required and the numbers are therefore
not reliable. CRDB/CDC has provided a renewed outreach
program to ensure data quality is improved.
Regarding the
progress of partnership work, the P&H-TWG is supporting
RGC in leading development effectiveness work. The DCPS
(2014-2018) addresses a joint commitment by the
Government and DPs in strengthening effective
partnership work towards achieving results. The
membership of the TWG was updated. The P&H-TWG has led
the process of TWG performance review which has been
followed up through a 'strengthening exercise' due to be
completed during Q2. A meeting of the TWG Network
Meeting was conducted in Q3 in order to identify,
discuss and agree measures to improve performance. In
the next step, further progress must be sought by: (a)
dedicated support to PBAs across line ministries that
have identified these as priorities; and (b) continued
implementation of PFM reform at sector level to
strengthen PFM and procurement systems. Development
partners must also be encouraged to understand and use
national systems, employing capacity development support
or additional safeguards to address fiduciary risk. This
includes improved reporting to the ODA Database to
support planning/budgeting and to ensure accurate P+H
JMI monitoring.
The TWG-PPR
reported either completed or on-going status with good
progress for all its 3 Outputs. First, the target for
the finalization, approval and implementation of the
NSDP along with the 3-Year Public Investment Plan (PIP)
scheme and the strengthening of the planning, monitoring
and evaluation mechanisms have been partially-met with
good progress made. Second, the preparation of the
concept note and dialogue on possibility of linking
Health PIPs and NSDP has been completed. Third, the work
towards the approval and implementation of the National
Strategy for Development of Statistics (NSDS) 2016-2018
and National Science and Technology Master Plan
2014-2020 for better planning and higher productivity is
being done with some targets met. To continue the good
progress and make sure all targets met, the TWG-PPR
emphasizes the necessity to continue quality cooperation
between stakeholders in following up actions agreed at
the TWG meetings and the sub-group meetings, aligning
DPs' support, and building the TWG capacities in regard
to statistics, planning, M&E and other related topics.
The work on
Anti-Corruption has also been reported to be on-track in
achieving targets. Self-assessment report on laws and
law enforcement in relation to fighting against
corruption has been drafted and submitted to the Council
of Ministers for input and comment. The Executive
Summary Report on the UNCAC Implementation Review of
Cambodia was set to be developed by the UN and UNCAC
state parties. However, the task is not without its
challenges. The process of collecting relevant data and
statistics to complete the self-assessment report has
been difficult because Cambodia does not yet have
information technology system to manage, collect and
analyze information on the number of cases at relevant
institutions/ministries and courts. The ACU has also
confirmed that 100 percent of Higher Secondary School
civic education teachers were trained on anti-corruption
education, though the process is on-going. Progress on
cooperation between the private sector and the ACU in
anti-corruption ethics and compliance in business is
enhanced through: 3 consultation meetings with the
participation of 28 private sector entities and 10
government private sector working groups; 20 companies
having signed an MOU on Cooperation with ACU; and the
Guidebook on Anti-Corruption Program being finalized.
Side 1 of the Rectangular
Strategy: Promotion of the Agriculture Sector
By March 2015, achievement of the 3.18t/ha target on
average rice yield was almost achieved (3.08t/ha). The
output was lower than expected due to the unsuitable
climate encountered drought in the early season and the
Mekong flood in the middle of wet season. The expected
output indicator would be 3.122t/ha in 2015-2016.
However, the TWG has had good achievements for the
remaining outputs. The Crop Diversification Index
reached 39% (exceeding the 35% target) and irrigated
area for rice crop reached 1.546 million hectare
(exceeding the target of 1.545 million hectare). The
10-year Strategic Planning Framework for Livestock was
set to be submitted for endorsement by end of April
2015. Role and functioning of the TWG-AW has been
revised and endorsed during the plenary TWG meeting in
early April in line with the TWG Strengthening exercise
supported by CDC and the P+H TWG.
Progress was realized in the implementation of
sustainable forest management and conservation to ensure
a contribution to poverty alleviation and macro-economic
growth (JMI 9). The Community Forestry is set to be
enhanced and increased and the reforestation on
non-forest and/or heavily degraded forest areas is
on-going with some progress made. 66,932 hectares of
Protected Forests and Wildlife Conservation Areas was
established (about 67% of target set). The last output
on sustainable Forest Financing program through one
signed Emission Reduction Purchasing Agreement was
completed. Therefore, the TWG-FR has set a new target of
200,000 Voluntary Carbon Units to be sold in 2015.
Despite the good progress, a number of challenges have
been raised. These include the interdependence on MAFF
in the approval of Community Forest establishment;
limited capacity and human resource in the Forestry
administration; insufficient fund supports;
time-consuming and complex procedures and the issues of
harmonizing the implementation of REDD+ at both national
and subnational levels.
For Fisheries, by the first quarter of 2015, good
progress has been made on the Output 1 (JMI 10) on
wild-harvested fish production, effective deep pools
protection, registered Community Forests being
strengthened and the establishment of community fish
refuges. The demarcation work has not been significantly
implemented both for flooded and coastal forests during
the reporting period because of other budgetary
priorities. This, however, will be carried out in Q3 and
Q4 of 2015. The indicator on aquaculture production was
120,000 tons in 2014 (increased by 20% in annual
projection), exceeding the target of 102,000 tons
produced by the end of 2015. One MoU on general
cooperation in the fisheries sector and a separate one
called MoA on the cooperation arrangement on safety
assurance for export fish and fishery products between
Cambodia and Vietnam had been drafted and exchanged for
comments. The National Strategic Plan for Fish and
Fisheries Value Chain has been initiated and the
consultant recruitment for developing the document has
been processed. The draft national standards for fish
paste, sun-dried fish and quick frozen shrimp/prawn have
already been approved by the National Standard Council
and being put for official endorsement by the National
Board Committee (inter-ministerial) meeting. The
constraints faced in the implementation are mainly
related to limited capacity of FiA's M&E and the quality
of the system itself, which needs to be well-adapted by
all partners in order to have good synchronization in
the future. The TWG emphasizes the importance of CDC's
further technical support in regard to the PBA
awareness.
The Comprehensive Land Policy (JMI 11) was finalized and
submitted to the Council of Ministers for endorsement in
March 2015. The first draft of Land Management and Urban
Planning Law is being discussed at the technical level,
and the draft Construction Law is being developed. This
is on-track to being publicly consulted and finalized by
end-2015. Moreover, the National Housing Policy has been
adopted since May 2014, with the General Department for
Housing and line departments and bureaus established and
Prakas on establishing sub-national mechanisms in place.
At least 28 Indigenous Peoples Communities (IPC) will be
registered by the end of 2015, as to date there have
been 21 communities involved in collective land titling,
while the remaining 7 are in the planning process (the
target set was 10 IPCs). Until March 2015, 26 Interim
Protective Measure has been provided to the IPCs that
have submitted their applications. In addition, a final
draft of instructions to convert private land title of
indigenous peoples to communal land title was finalized
for internal review and consultation and the external
consultation is expected to be conducted in May 2015.
Training courses on the Sub Decree 83 were provided for
the provincial state land management committee, district
working groups and NGOs in three different provinces. A
number of training courses were also conducted to
enhance capacity of the Cadastral Commissions at
district and provincial levels. On the last output,
stock-taking exercise of state land available for social
land concession is under review. Overall, good progress
has been made in implementing JMI 11.
The target to release land (of mine/ERW affected areas)
and for it to be used productively by intended
beneficiaries for the development of their livelihoods
and for rural infrastructure has been mostly met.
However, there has not been any training to the Mine
Action Planning Unit staff members on land rights yet.
In 2014, there were 154 mine/ERW casualties reported,
which is still more than the target of less than 100.
The set target of at least 1,000 villages visited during
Quality of Life Survey by the CMAA staff was not met yet
(actual: 162 villages visited in 2014). The TWG-MA
reported that the set target for 2014-2015 will be
unachievable due to limited number of their staff. Thus,
a new indicator of at least 500 villages visited has
been set instead.
Side 2 of the Rectangular
Strategy: Development of Physical Infrastructure
Transport system
improvement has been considered an important priority as
part of infrastructure building in Cambodia and the
Ministry of Public Works and Transportation has planned
for a number of outputs to be achieved by end of 2015.
These include the starting of the construction
activities of major roads (NR1; NR2; NR3; NR5 and NR7);
expand SHV port; legislate the Port Act; and to
formulate expressway development plan of priority
sections. These works are in the process with some
targets partially met. The TWG-IRI has reported some
slight delays occurred. Another output on national
electricity grid network improvement to complete the
construction of the 115KV and 230KV transmission lines
been successful. However, the TWG-IRI is continuing the
work.
Side 3 of the Rectangular
Strategy: Private Sector Development and Employment
The Council for the
Development of Cambodia reports progress in the
implementation of private sector development indicators
(JMI 14). The Business Plan for the National Single
Window was endorsed in 2014, but implementation is
contingent to mobilization of budget. Moreover, the
National Trade Repository (NTR) was expected to be
launched in August 2015. Certificates of Origin have
been automated with support from the World Bank Group,
and the automation of company registration is being
tendered. Progress has been reported on activities for
improving the Business Enabling Environment as follows:
(1) draft Amended Investment Law is under discussion;
(2) Sub-Decree for setting up a National Committee on
Non-Tariff Measures and NTR has been passed since 2014;
and (3) the draft E-commerce Law has been finalized by
the Council of Ministers.
Side 4 of the Rectangular
Strategy: Capacity Building and Human Resource
Development
During the
reporting period, the Education TWG (JMI 15) reported
that the percentage of five-year old children in ECE
increased from 56.6% in SY 2012/13 to 61.4%, below the
target of 66% for SY 2014/15. Additional efforts for
achieving the target and reviews of the target in the
Mid-term Review of Education Strategic Plan (ESP)
2014-2018 in 2016 are required as the target is perhaps
too ambitious. The lower secondary gross enrollment rate
increased from 53.6% in SY 2012/13 to 55.3% in 2013/14
and decreased slightly to 55.1% in SY 2014/15 against
the target set at 66.9%; while the survival rate to
grade 9 increased from 30.7% in SY 2012/13 to 35.7% in
SY 2014/15, achieving the target of 35% set. The lower
secondary drop out slightly decreased from 21.2% in SY
2012/13 to 21% in 2013/14; however, this is far from
achieving the target of 19% in SY 2014/15. Thus, further
efforts are required to catch up. The RGC provided
59,971 scholarships for lower secondary students (59.8%
of whom are female), which is already above the 55,000
target. Results of the national assessments of students
learning in Khmer and Mathematics at Grade 3 and Grade 6
have been analyzed, and the dissemination of the results
to subnational level is on-going. All the targets set
for primary and lower secondary students receiving
textbooks have already been achieved (Grade 1-3; 4-6;
and 7-9). Some general follow-ups actions have been
identified. These include a need to strengthen the
process of the TWG-Education at the subnational level
where aid effectiveness could not only make at policy
level, but also at implementation level; implementation
gaps among regions to be identified with respective
interventions; and an increase in involvement by
communities and private sector in education.
With regard to
Health (JMI 16), progress against the targets set was
mixed. The share of deliveries at health facilities
increased to 83% in 2014, achieving the target, but
on-going progress remains to achieve the 85% set for
2015. The percentage of Health Centers with at least one
secondary midwife increased from 75% in 2013 to 80% in
2014, below the targets of 85% in 2014 and 100% in 2015.
However, this was a result of a time-lagged effect of
the HC constructions to be functional only in 2014. In
this regard, the target of this indicator is proposed by
the TWG-Health to be 85% for 2015. The contraceptive
prevalence rate increased from 34% in 2013 to 39% in
2014, achieving the target of 37%. The percentage of
exclusively breastfeeding until 6 months was set to
reach 75% in 2014 and 76% in 2015. However, the actual
result was only 65% in 2014 (a major decrease from 74%
in 2010). The Ministry of Health and the Health Partners
perceived several challenges, including an increase of
young women in employment (secondary and tertiary
sectors); the easy access to Breast Milk Substitute by
strong advertisement campaigns; and the increased value
of women's time in the phase of rapid socio-economic
development. Therefore, an indicator revision has been
proposed to ''percentage of early initiation of
breastfeeding within one hour of birth increases from
65.8% in 2010 to 70% in 2015 among women who delivered
at health facilities''.
The TWG-RWSSH
reported on-going work in regards to the establishment
of the National Program for Rural Water Supply,
Sanitation and Hygiene, with articulated roles and
functions at national and subnational levels, which is
on-track to achieving the target. The TWG also mentioned
that resources to be allocated to RWSSH by the
government increased by at least 10% annually, as
targeted; nonetheless, there has been a delay reported
in the implementation of program-based budgeting for
rural water and sanitation since the DP/NGO Mapping is
still in process. The target on the development of
Management Information System (MIS) (by December 2014)
had been delayed but is still in progress. This has led
to a delay in the training of relevant staff in charge
on the functioning of MIS system and data collection
(previously set to be done by June 2015).
Regarding HIV/AIDS,
the target on 80% of coverage for interventions for
MARPs (Output 1/JMI 18) has not been reached yet and the
implementation is on-going. One main challenge to this
is the data recording issue as there was no surveillance
update of data conducted in 2014, as the TWG reported.
The targets on percentage of adults and children with
HIV currently receiving treatment have not been reported
yet, though this work is on-going. In addition, the work
leading to costing NSPIV through best available evidence
and resource mobilization plan is still on-going as the
completion of NSPIV faced a delay and was set to be done
in June 2015.
The Social Protection, Food Security and Nutrition TWG
(JMI 19) reported good progress made. The strategic
national documents such as the National Strategy for
Food Security and Nutrition (NSFSN), the Road Map for
Nutrition 2014-2020, and the investment plan for
Nutrition have already been adopted, with several
costing exercises done. Therefore, the TWG has proposed
for a revision on the output, which is ''The National
Strategy for Food Security and Nutrition (NSFSN), the MoH, MRD and MAFF Road Maps for Nutrition, and their
respective investment plans for Nutrition are developed
coherently through meaningful consultation and formally
adopted along with enforcement of existing guidelines by
the RGC.'' The work strengthening the information and
knowledge management, data analysis and coordination at
national and subnational level to measure the evolution
of FSN situation is still on-going, but remains
challenging. In addition, some targets and activities
set for the approval of the National Social Protection
by 2014 have been achieved and continued, while some
remain in progress. The TWG thus proposes a change to
the second Output to ''A National Social Protection
Action Plan is approved in 2015 to scale up the
delivery of social protection programs through an
effective, efficient, and coordinated system.''
On Gender (JMI 20), the Cambodian Gender
Assessment 2014 and the Five-Year Neary Rattanak IV
2014-2018 were finalized and officially launched in
December 2014. Line ministries have disseminated the
documents internally through their Gender Mainstreaming
Action Groups. The National Gender Policy document has
also been drafted internally for further review based on
the outcome and findings from the forthcoming Gender
Audit on Governance, Leadership and Decision-making.
Progress has been made regarding the MAF implementation
work until end of 2015; the finalization of the policy
on Women's Economic Empowerment (WEE); and the approval
of NAPVAW II by the Council of Ministers. The proportion
of women in decision-making in the civil service was
reported to increase from 19% in 2012 to 20% in 2014;
the proportion of female civil servants has increased
from 37% in 2013 to 38% in 2014; while the rest of
targets are not reported due to the pending PBA on women
in leadership. |
|
Table 2. Summary of JMI Implementation Status
Target
|
Action Needed
|
Summary Progress
|
Core of the Rectangular Strategy: Good
Governance
|
1. Judicial service & access to justice are
strengthened
|
1. Dissemination and
enforcement of the three main laws concerning
judicial system
2. Case Management improved
3. Lawyers for the poor
|
1. Good progress
2. Promising progress
3. Some progress
|
2. Cambodia Civil Service is
more transparent, efficient, and effective
|
Action Plan for Administration
Reform approved by 2014
(Compensation Reform; Public
service standards; HR management and
development)
|
NPAR 2015-2018 approved
Action Plan prepared
|
3. Public service delivery
brought closer to citizens
|
1. Legal framework and
capacity of SNAs strengthened for own source
revenue collection
2. Functional reassignment
process implemented (from Central Government to
SNAs)
3. Social Accountability
Strategic Plan implemented
|
1. Target not met, policy
analysis reviewed
2. On-going, with small
progress
3. On-going, all preparations
completed
|
4.
More effective and efficient public financial
management
|
1. Further improvement in
budget comprehensiveness and transparency
2. Improvement in financial
accountability/improvement in budget credibility
and accountability
3. Further improvement in
budget policy linkages
|
1. On-going, partially met
2. On-going, on-track
3. On-track
|
5.
Development cooperation programmed and delivered
in line with RGC's priorities/principles
|
1(a). Increased share of ODA
is delivered through PBAs; (b). using
procurement systems
2(a). Increased share of ODA
reflected in RGC budget and plans
2(b). Financing of development
priorities based on all available resources (ODA
& RGC's)
3. Improved effectiveness of
TWGs and alignment to NSDP 2014-2018 priorities
|
1. a). Target unmet; b).
target exceeded
2. a). Target met; b). data
shared with MEF and TWG membership
3. The TWGs external review
conducted
|
6.
NSDP 2014-2018 is approved toward achieving all
national goals, including CMDGs, and assessed
based on quality data
|
1. NSDP Document finalized,
approved, and implemented along with the3-Year
PIP scheme and the Planning and M&E mechanisms
strengthened
2. Link between Health PIPs
and NSDP initiated on pilot basis
3. National Strategy for
Development of Statistics (NSDS) 2016-2018 and
National Science and Technology Master Plan
2014-2020 approved and implemented
|
1. Partially met, on-going &
good progress
2. Completed
3. Partially met, on-going
|
7.
Combat corruption
|
1.
Necessary legal frameworks and measures
for fighting against corruption are identified
2.
Anti-Corruption Education is provided to
Lower and Higher Secondary School students and
students/trainees at RSA, RCJP, RMA, RPA, and
SMS
3.
Cooperation between the private sector
and the ACU in anti-corruption is enhanced.
|
1. Draft assessment submitted
to CoM
2. On-going, good progress
3. Successful, on-going
|
Side 1 of the Rectangular
Strategy: Promotion of the Agriculture Sector
|
8.
Enhanced agricultural productivity and
diversification and
water resource management
|
1. Average rice yield reached
3.18t/ha
2. The Crop Diversification
Index reached 35% of total sown area
3. Irrigated area for rice
crop reached 1.545 million ha
4. SPFL document submitted to
RGC for signature
|
1. Partially met, on-track
2. Target exceeded
3. Target exceeded
4. To be submitted for
endorsement
|
9.
Sustainable forest management and conservation
|
1. Community Forestry
strengthened and increased
2. Reforestation on non-forest
and/or heavily degraded forest areas
3. Establishment of Protected
Forests and Wildlife Conservation Areas
4. Sustainable Forest
Financing program through one signed ERPA
|
1. On-going
2. On-going
3. Partially met, on-going
4. Completed
|
10.
Mgt, conservation, and dev't of sustainable
fisheries
|
1. The availability of fresh
water and marine fisheries production remains
stable
2. Fresh water and marine
aquaculture production substantially increased
3. Improved support for
quality & safety of fish products to fishers,
processors & exporters
|
1. Partially met, on-going,
good progress
2. Target met
3. Documents drafted, awaiting
approval
|
11.
Administration, management and distribution of
land
|
1. Comprehensive Land Policy
and legal framework on LMUP completed
2. Land Registration Process
is strengthened ( focus on IPCs and vulnerable
households)
3. Countrywide acceleration of
implementing the SLCs distribution program
|
1. Partially met, on-going
dialogue
2. On-track; good progress
3. Stock-taking of state land
under review
|
12.
National mine action program
|
1. Released land is
productively used by intended beneficiaries for
development purposes
2. Reduction in the number of
reported mine/ERW casualties
3. Mine/ERW survivors are
informed of their rights and have access to
effective support
|
1. Some targets met, on-going
2. Target unmet
3. Target unmet, on-going
|
Side 2 of the
Rectangular Strategy: Development of Physical
Infrastructure
|
13. Improved access to
efficient and safe infrastructure system
|
1. (i) commence construction
activities along major roads, (ii) expand SHV
port and legislate the Port Act, and (iii)
formulate expressway development plan of
priority sections
2. Complete the construction
of the 115 KV and 230 KV transmission lines
|
1. Partially met, on-going,
with some slight delays
2. Successful and on-going
|
Side 3 of the
Rectangular Strategy: Private Sector Development
and Employment
|
14. Increased trade flows and
improved Business Enabling Environment
|
1. Increased trade flows, by
streaming border procedures and improving
transparency of trade and investment rules
2. Business Enabling
Environment improved as a result of regulatory
reforms
|
1. Partially met, on-going
2. Amended Investment Law
under discussion, Sub-Decree on NTM&NTR passed,
draft E-commerce law finalized
|
Side 4 of the
Rectangular Strategy: Capacity Building and
Human Resource Development
|
15. Completion Rate of
Students in Basic Education increased
|
1.
Increased student promotion rate in
primary particularly in early grades
2.
Student enrolment in Lower Secondary
increased and drop-out at the lower-secondary
reduced and controlled
3.
Student learning performance in Khmer and
Mathematics at Grade 3 and Grade 6 improved
|
1. Partially met, on-track
2. Gross enrolment rate below
target, survival rate to grade 9 met, lower
secondary drop-out rate far from target, target
met for lower secondary scholarships
3. Target met
|
16. A functional and
sustainable national health system
|
1. Improved RMCH through
enhancing quality and effectiveness of health
care services via:
(a) Expanded coverage of
deliveries by skilled birth attendants at health
facility
(b) Expanded consultation
services on birth spacing options
2. Improved nutrition status
through: increased provision of counseling on
exclusive breastfeeding and appropriate
complementary feeding
|
1. a). On-going;
1. b). Partially met, on-going
progress
2. Backward, far below target
|
17. Improved wat-san in rural
areas
|
1. National Program for RWSSH
reflected roles of national and subnational
level established
2. Resource flow of RWSSH
sector increased
3. Unified RWSSH sector
Management System (MIS) developed and
operationalized
|
1. Partially met, on-track
2. Partially met, some delays
3. Delayed, back in progress
now
|
18. Reduce new HIV/AIDS
infections/death and increase ART
coverage
|
1. 80% Coverage interventions
for MARPs
2. Eligible PLHIV on ARV
treatment for Adult and
HIV infected children
3. Costed
NSP IV using best available evidence
and resource mobilization plan endorsed
|
1. Target unmet, with some
progress
2. Partially met, on-going
3. Awaiting the completion of
NSPIV
|
19. Improved SPFSN status and
social protection system
|
1.
FSN strategies for effective and
harmonized implementation are developed and
funded
2.
A NSP Action Plan is approved (in 2014)
to scale up the social protection programs
delivery
|
1. Successful, on-going
2. Partially met, in progress,
Action Plan to be approved by 2015 instead
|
20. Improvement in the
enabling environment for gender equality and
women's empowerment
|
1. Neary Rattanak IV and
National Policy for GE and WE put in practice
2. Two main gender equality
PBAs on WEE & NAPVAW fully functional
3. Women's participation in
decision making in the public sector increased
to meet the CMDGs
|
1. Policy documents finalized,
approved and being disseminated
2. Established, resourced &
implemented
3. On-going, on-track
|
|
|
Table 3. TWG Performance Review: Survey Scoring Summary
TWG Chairs and Lead DP
Facilitators were asked 8 questions related to TWG
performance and support. Responses were provided
confidentially but the following charts show the
averages and the range of responses across the 14 TWGs
for which both RGC and DPs data was provided.
Quantitative analysis
shows that: (i) based on averages across 14 TWGs, RGC
rates TWG performance higher on all criteria; (ii) the
range is quite high across all questions, meaning that
TWGs have a wide range of perceptions and experience;
and (iii) RGC average perceptions generally fall in the
upper half of the range (i.e. 5-10) while the variance
for DPs is larger with the average more often extending
to the lower half of the scoring range.
|
|
Analysis of TWG funding
The effort to strengthen
TWG performance and sector management can be assisted by
viewing the data regarding project support and
development partner activity in each TWG. This is
presented in Table 18
below. The data is presented according to the NSDP
categories, however the mapping is not precise (the
standard ODA Database sector classifications are more
closely referenced to the NSDP). It must also be noted
that figures represent total development partner
support, some of which is to non-Government actors.
Table 4. 2014 Funding and Development Partner Activity
in TWGs
|
Total 2014
(USD 000s)
|
# DPs
|
Projects in TWG
|
Average project size
(USD 000s)
|
Social sectors
|
Health
|
131,170
|
15
|
60
|
2,186
|
HIV/AIDS
|
10,392
|
6
|
9
|
1,155
|
Education
|
74,510
|
12
|
47
|
1,585
|
Food Security and Nutrition
|
33,532
|
5
|
7
|
4,790
|
Rural Water & Sanitation
|
57,279
|
7
|
10
|
5,728
|
Sub-total social sectors
|
306,884
|
|
133
|
2,307
|
Economic sectors
|
Agriculture and Water
|
191,942
|
14
|
64
|
2,999
|
Fisheries
|
7,255
|
5
|
9
|
806
|
Forestry
|
8,547
|
7
|
18
|
475
|
Land
|
4,813
|
4
|
11
|
438
|
Mine Action
|
15,070
|
6
|
8
|
1,884
|
Private Sector Development
|
7,038
|
8
|
9
|
782
|
Sub-total economic sectors
|
234,665
|
|
119
|
1,972
|
Infrastructure sectors
|
Infrastructure & Regional Integration
|
442,911
|
8
|
68
|
6,513
|
Cross-sectoral and administrative sectors
|
Public Administrative Reform
|
927
|
4
|
4
|
232
|
Public Financial Management
|
17,312
|
7
|
10
|
1,731
|
Decentralization and Deconcentration
|
28,143
|
9
|
16
|
1,759
|
Gender
|
8,065
|
11
|
21
|
384
|
Legal and Judicial Reform
|
10,144
|
10
|
15
|
676
|
Partnership & Harmonization
|
1,721
|
2
|
2
|
861
|
Planning & Poverty Reduction
|
6,405
|
5
|
6
|
1,068
|
Sub-total cross-sectoral
|
72,718
|
48
|
74
|
983
|
Multiple TWGs (> 4)
|
35,393
|
3
|
4
|
8,848
|
No TWG
|
129,015
|
23
|
191
|
675
|
Grand Total
|
1,221,587
|
34
|
589
|
2,074
|
This data only reports
what has been recorded by development partners regarding
their TWG activity linked to project funding. It is also
acknowledged that some development partners make an
important contribution to TWGs and partnership work
without having any projects or funding (e.g. the
Partnership & Harmonization TWG includes all development
partners but only 2 recorded partners and projects).
NGOs are also important TWG members but their membership
and contributions are not included in this analysis.
The importance of the
Health (15 partners, 60 projects), Agriculture & Water
(14/64) and Education (12/47) TWGs is immediately
apparent. Other TWGs with fewer partners and projects
may consider this data and contextualize it with other
information in order to reach informed decisions about
the best approaches to secure their coordination and
development effectiveness objectives. Overall, the
Infrastructure and Regional Integration TWG coordinates
the largest portfolio (USD 442,911 in 2014, 36% of
funding but only 12% of total projects). Social sectors
account for approximately a quarter of both funding and
projects, while the economic sectors account for an
additional fifth. It is also noteworthy that almost
one-third of all projects (191/589), representing 11% of
total funding, are not associated with any TWG. This
emphasizes the need for mechanisms outside of the TWG
framework to support coordination work.
The efforts in TWG Strengthening Exercise and the
preparation of the Joint Monitoring Indicators (JMIs)
for 2014-2018 have been critical parts of 2014-2015
results-based partnerships. Notably, the TWG Performance
Review Study addressed that,
''the TWG architecture is
generally sound but performance is mixed and there are
several areas in which improvements should be made in
line with joint partnerships including shared learning
and commitment that promote individual TWG performance''.
This would need a further reinforcement of the
individual TWG leadership in supporting and accounting
sector results.
There is significant
evidence of TWGs' focused and committed efforts to
review and strengthen their performance. These efforts
are to be commended as they demonstrate the leadership
of Government and the willingness of all TWG members to
work together to achieve improved development results.
The findings and recommendations that have been
submitted to CDC have been used to revise the Guideline
on the Role and Functioning of the TWGs. After being
reviewed at a meeting of the TWG Network in the second
half of 2015, the Guideline is now finalized and can be
used by TWGs to guide their work and improve their
performance.
The successful use of the JMI model requires
continued effort in three principal areas: focusing on
results, mobilizing resources and strengthening
partnerships. Focusing on results must begin with a
clear link between the JMI and the NSDP or sector
policy/plan. This can be increasingly assured by
adopting or consolidating a PBA that places the program
at the center of all dialogue on results, resourcing,
implementation and monitoring. Many TWGs reported to be
making good progress on these. Efforts must be
maintained and strengthened relates to resource
mobilization and partnership building. Most TWGs appear
to have made important strides in establishing closer
working relations based on respect for national
ownership and a mutual commitment to achieving results
based on RGC priorities. This important progress can now
be consolidated by moving towards improved adoption and
utilization of PBA management practices that clearly
link sector program objectives with resources and
monitoring arrangements. This is very much in line with
the recommendations identified in the previous section
on TWG performance review. The on-going strengthening of
the TWGs in specified areas will also serve to reinforce
the implementation of the JMIs.
|
|
|
Mutual Accountability and Partnerships for Results
(