Results: outcome, output &
indicators |
Activities: milestone
actions |
Inputs: management,
coordination & resource |
Immediate outcome |
Output |
Output indicator |
Activity |
Associated aid
effectiveness actions |
Coordinating Institution |
Implementing Institution |
Timeline |
Funding & inputs |
Implementation and Management
of the National Strategic Development Plan-Update (NSDP-Update) |
Joint Monitoring Indicator 1:
Planning and Poverty Reduction |
1. Improved MOP and line
ministries and agencies capacity to monitor the
implementation of NSDP Update 2009-2013, including the
preparation of the MTR in 2011 following the participatory
approach used in NSDP preparation |
1.
MPSP 2009-2013
2.
NSDP MTR 2011
|
1.
Aligned available resources of DPs and the Government to
implement the MPSP in 2010-2011 confirmed by June 2010
2.
NSDP MTR finalized by end Sept 2011 |
1.
MOP
and DPs review and adopt MPSP 2009-2013 by May 2010.
2.
MOP
and DPs, review and adopt an AOP for the last six months of
2010 by June 2010, and for 2011 by mid Dec 2010.
3.
Prepare and implement a capacity development plan for MOP by
June 2011.
4.
M&E
sub-group of the TWG-PPR to complete work on the update of
NSDP indicators by June 2011.
5.
Develop and finalize MTR by Sept 2011 supported by the
monthly meetings of the TWG-PPR M&E sup-group during the MTR
preparation period. |
1.
Finalize and endorse Partnerships Principles in order to
prepare a PBA for MOP by June 2010.
2.
Update PBA roadmap to support rollout of PBA for MOP.
|
PPR
TWG/MOP |
MOP |
|
RGC
& DP
|
2. Strengthened institutional
arrangements for harmonization of planning, public
investment expenditures and development cooperation
financing processes
|
3.
Situation analysis report
4.
Action Plan to achieve strengthened institutional
arrangements for harmonization of planning, public
investment expenditures and development cooperation
financing processes |
3.
Situation analysis report finalized by Dec 2010 and action
plan for strengthened institutional arrangement and
harmonization of planning, public investment expenditure and
development cooperation financing finalized by Dec 2011
|
Under the guidance of the RGC’s
Task Force for Managing the Process of Harmonizing Planning,
Public Investment Expenditure, and Cooperation Financing:
6.
Carryout situation analysis that will develop
recommendations to harmonize the planning (MOP), public
investment expenditures (MEF), and development cooperation
financing (CRDB/CDC) processes by Dec 2010.
7.
Finalize an action plan along with appropriate monitoring
indicators to implement the recommendations by June 2011.
|
|
MOP as Chair of
the RGC Task Force
|
MOP, MEF, SNEC, CRDB/CDC |
|
Gov’t
& DP
|
Joint Monitoring Indicator 2:
Aid Effectiveness |
Harmonized and aligned
development cooperation makes a demonstrable contribution to
the delivery of RS-II, NSDP by furthering sector
outcome-level results |
New &/or improved programme-based
practices and partnerships to implement sector programmes in
a results-based manner, address fragmentation and promote
predictability including:
sector plan
AOP
(incl aid)
capacity assessment
aid effectiveness JMI activity
joint results-based review |
1.
a.
Number of PBAs
Baseline: 7
Target: 10
b. PBA as % of aid
Baseline: 28% (AER
2010)
Target: 50%
2.
Improved predictability
a. Aggregate predictability
MYIFF
+/- 10%;
b. Individual DPs
MYIFF
+/-15 %
(Baseline for aggregate
predictability = 104%)
(2008 PD survey) or as per 2010
AER if significantly worse |
1.
CRDB/CDC to facilitate TWG Network of RGC secretariats (and
trainings)
2.
CRDB/CDC to facilitate capacity assessments of TWGs/sector
ministries
3.
CRDB/CDC to provide support on PBAs and capacity development
(incl TC) to reduce fragmentation and improve predictability
through joint planning/review processes
4.
CRDB/CDC to conclude and follow-up "Making Partnerships
Effective" work
5.
P+H
TWG to serve as peer review mechanism
6.
P+H
TWG to support analytical work on country system use
7.
Development partners to explicitly state aid effectiveness
commitments in Country Programme documents.
|
CRDB/CDC
P+H
TWG |
All line ministries
DPs
TWGs
|
1. 2 per annum
2. 2nd half 2010
3. Q3 2010
4. Q3 2010
5. 3 TWG meets pa
6. Q1 2010
7. New country Program from
2011 |
MDSP
support to CRDB/ CDC (confirmed)
RGC
& DP sector support (not confirmed)
All DPs to negotiate new
programs in consultation with CRDB/CDC |
NSDP-Update
Social Sector Priorities |
Joint Monitoring Indicator 3:
Education |
Enrolment rate in lower
secondary education increased |
Student promotion in primary
education increased |
Promotion rate in primary
education increases from 82.8% in school year (SY) 2008-09
to 85% in SY 2010-11
|
1.
Reinforce implementation of the grade promotion regulation
at all primary schools
2.
Deploy 95% of newly trained teachers to under-staffed
schools and in remote areas
3.
Reduce the percentage of incomplete schools from 18% in SY
2009-10 to 15% in SY 2010-11
4.
Strengthen EMIS for evidence based decision making, e.g. in
the context of availability of new population census data.
|
1.
Implementation of an analytical joint annual sector review
and development of a timely, comprehensive and accurate
annual operational plan (AoP)
Indicators:
a. Participatory process
of education congress
b. An analytical
education congress report preparation and its aide-memoire
produced in a timely manner through collaborative efforts by
MoEYS and ESWG
c. A comprehensive AoP prepared
in a timely manner based on the results and recommendations
of the education congress and the MoEYS Budget Strategic
Plan and the annual Programs Budget Plan
2.
Coordination of capacity development initiatives
Indicators:
Medium-term capacity
development strategies prepared in priority areas. |
MOEYS |
MOEYS |
By SY 2010-11 |
Gov’t
& DP
|
Joint Monitoring Indicator 4:
Health |
Decrease maternal and new-born
mortality rate |
Increase the proportion of
deliveries attended by skilled health personnel in the
public sector |
Increase the proportion of
deliveries attended by skilled health personnel in the
public sector from 63% in 2009 to more than 75% by December
2010, and more than 80% in December 2011 |
1.
Recruitment of at least 50 secondary midwives by the end of
2010
2.
MOH
and Health Partners commit to increase both Government and
total Health Partner funds to RMNCH in 2010-2011, and to
ensure that these resources are reflected in Annual
Operational Plans at all levels.
3.
Launch of Maternal Death Surveillance Room to support
ongoing MoH Maternal Audit and response activities.
|
1.
Development and Implementation of AOP 2010 & 3YRP
2.
Implementation of IHP workplan |
TWG-H
TWGH Secretariat |
MoH (NMCHC, HRD, PD, UHS and
RTCs)
MOH (DPHI & DBF) & HPs |
Intermediate result December
2010 and total time line December 2011 |
National budget & support from
HPs |
Joint Monitoring Indicator 5:
HIV/AIDs |
1. Improved national response
coordination & management mechanisms leading to efficient
harmonisation and alignment of stakeholder (RGC, DPs, NGOs,
technical assistance providers and affected communities)
resources (financial and technical) and efforts to address
the priorities of NSP II & to inform the development of NSP
III |
1.
National and sub-national
coordination mechanisms reformed and effectively supporting
harmonisation and alignment of partner
(national/international) contributions to the national
response
2.
National AIDS Spending
Assessment informing resource tracking and allocation in the
national response
3.
Priority financial gaps of
NSPIII mobilised in GFATM Round 10 proposal |
1.
Number of new ToRs and
membership lists for reformed national and sub-national
coordination mechanisms
2.
Number of results-based plans
of reformed national and sub-national coordination
mechanisms implemented and monitored
3.
Management, Roles and Functions
Guidelines
4.
RGC
and partner financial commitments tracked by NASA categories
5.
TRP
recommend a category 1 or 2 on GFATM Round 10 proposal
submission |
1.
Develop new ToRs and update
membership of reformed national and sub-national national
response mechanisms
2.
Develop results-based plans
with tangible indicators to inform the work of reformed
national and sub-national coordination mechanisms
3.
Develop guideline(s) to inform
the management, roles and functions of reformed national
and sub-national coordination mechanisms for the national
response
4.
Orient key stakeholders to
implement management, roles & functions guidelines and
initiate RBM and leadership training
5.
2010 NASA undertaken under
technical leadership of the NAA, involving key stakeholders
6.
NASA results disseminated to
inform advocacy and action on evidence-based allocation of
resources and for further resource mobilisation work
7.
Round 10 proposal developed by
stakeholders in line with CCC proposal development manual
|
1.
Policy Board of the NAA to
review the Functional Task Analysis of the National
Response Report and make recommendations for action
2.
NAA to lead development of:
-ToRs, membership revision for
reformed national/sub-national coordination mechanisms.
-Development of Management,
Roles & Functions Guidelines
-Results-based planning with
reformed national/sub-national coordination mechanisms
3.
NAA to provide technical
support and lead on the 2010 NASA development and
preparation of NASA report and advocacy tools in conjunction
with key stakeholders.
4.
NAA to lead on programme and
financial gap analysis with key stakeholders to determine
key priorities for GFATM Round 10 proposal and lead proposal
development process |
NAA Secretariat and Boards
(Policy and Technical)
GDJ-TWG onHIV/AIDS |
NAA and its members
Reformed national &
sub-national response mechanisms
GFATM CCC, CCC-OC and CCC
Proposal Development Committee
|
June -December 2010 |
Bilaterals & Multilaterals (in
particular the UN Joint Team on AIDS)
CDC/CRDB (specific request for
RBM & Leadership training) |
2. Stabilized and reduced the
risk of mother-to-child transmission of HIV
|
Pregnant women who are HIV
sero-positive are accessing ARV to reduce the risk of
mother-to child transmission
|
6.
Numbers of PMTCT/linked
response sites are functioning to provide ARV to the target
population.
7.
Number of regular reports
submitted by the National Maternal and Child Health Center
to the TWG-HIV/AIDS Secretariat/NAA
|
8.
Revise and update membership
and TOR of the national PMTCT Working Group.
9.
Training of relevant staff on
PMTCT and linked response.
|
5.
Advocate for additional support
to the scaling up the linked response.
6.
Mobilize technical and
financial supports to the PMTCT/linked response
|
NAA
TWG-HIV/AIDS |
RGC line ministries as
appropriate
NGOs |
March 2011 |
GFATM round 9 Other funding
partnerships
Dev't Partner |
Joint Monitoring Indicator 6:
Food Security and Nutrition |
Through improved evidence,
emergency response, and coordination food security and
nutrition of the poor and vulnerable are improved |
A Food Security and Nutrition
Information Management System provides early warning for
emergency response, and evidence for M&E and targeting; and
reduces duplication while ensuring regular surveys are used
through enhanced coordination and cooperation of
stakeholders |
Annual Food Security and
Nutrition Information Report based on agreed indicators
produced by an integrated data analysis team and
disseminated to all stakeholders |
1.
The
Food Security and Nutrition Information Management Task
Force creates a list of indicators and their associated
actions that is endorsed by the TWG |
1.
Organize a promotion workshop
on the FSN Information management Task Force to coordinate
with ongoing monitoring activities of relevant government
line agencies and to avoid duplication by development
partners |
CARD
|
CARD, MAFF, MoP (NIS)
|
By October 2010
|
US$ 6,000 |
2.
Establish and strengthen the
capacity of a food security and nutrition analysis team
|
2.
Regular household surveys, such
as the Cambodia Socio-economic Survey, are analyzed for food
security and nutrition information |
CARD |
CARD, MoP (NIS), MOH (NNP
&DPHI) |
Ongoing |
US$ 45,000 |
NSDP Update Economic Sector
Priorities |
Joint Monitoring Indicator 7:
Agriculture and Water |
Enhanced agricultural
productivity and diversification and improved water resource
development and management |
1.Greater harmonization and
alignment of program planning, implementation and monitoring
and evaluation at both national and sub-national levels |
1.
A
roadmap for moving towards a Program Based Approach to
implementing the Strategy on Agriculture and Water (SAW) is
endorsed by TWGAW |
1.
Public expenditure review and public financial management
review for agriculture and water sector. |
1.
Joint commitment and action from RGC and development
partners to move towards a program based approach to
implementing the SAW. |
MAFF
MOWRAM
MEF |
ADB
WB
|
June 2010 |
RGC
DPs |
2.
Roadmap for SAW implementation. |
MAFF
MOWRAM
|
TWG-A&W
|
Dec 2010
|
TWG-AW
DPs (using basket fund) |
3.
RGC
budgets and human resources aligned to SAW. |
MAFF
MOWRAM |
MAFF
MOWRAM
TWG-AW |
Dec 2011
|
RGC
DPs
|
4.
Pooled basket funds for
specific activities, mini-SWAPs in areas where several DPs
and RGC may have a common interest, joint planning and M&E
mechanisms designed. |
MAFF
MOWRAM |
MAFF/PDAs
MOWRAM/PDWRAMs
TWG-AW |
Dec 2011 |
RGC
DPs |
2.
Rice, fruit and vegetable production is increased |
2.
Increased rice, fruit and vegetable yields increased by
2-3 % |
5.
Increased use of good quality seed varieties and appropriate
fertilizer usage. |
2.
RGC
and DP resources supporting joint work plans to support
extension services, farmer organization and irrigation
services (including training of irrigation engineers and the
Technical Service Center) |
MAFF |
MAFF, DPs, and NGOs |
December 2010
|
RGC, DPs, NGOs |
6.
Increased number of functional Farmer Organizations. |
MAFF |
MAFF, DPs and NGOs |
RGC, DPs, NGOs |
7.
Increased irrigated land area 1% (25000 ha/year)
|
MOWRAM |
MOWRAM, DPs and NGOs |
RGC, DPs, NGOs
|
8.
Increased number of functional
FWUCs |
MOWRAM |
MOWRAM, DPs, and NGOs |
RGC, DPs, NGOs
|
Joint Monitoring Indicator 8:
Land |
1. Improved Land Administration
and Land Tenure Security |
1.
Policy for Land Administration, Distribution and Management
Strengthened |
1.
Draft Policy on Land Valuation
2.
Draft on Housing Policy
3.
Sub-sector Programs on Land Management approved |
1.
Internal discussions
2.
Consultations with stakeholders
3.
Revisions
4.
Submission to CLP
5.
Design LM-SSP |
1.
Strengthen M&E Mechanism (for land sector) |
GS-CLP
MLMUPC |
GS-CLP
GDLM |
Dec 2011
June 2010
|
RGC
Germany
CIDA
Germany |
2.
Land Registration Strengthened with the focus on poor/
vulnerable households |
4. 1.7 million systematic land
titles distributed
5.
(Baseline: 1.2 million titles distributed)
6.
Percentage of women with land titles exceed men with land
titles
7.
(Baseline: Cadastral Database)
8.
3
indigenous communities are communally titled |
6.
Implementation of LASSP’s Land Titling Program in 15
Provinces |
|
GDCG |
GDCG |
Dec 2011
|
RGC
Finland
Canada
Germany |
2. Increased equity in land
distribution
|
3.
Implementation of the Social Land Concession mechanism
|
9.
From Jan 2010 to Dec 2011 number of communes that submitted
approved land use plans increases to 20 (baseline 10
communes)
10.Sub-sector Program on Land
Distribution approved
11. Stock taking on land
available and suitable country wide for SLCs |
7.
Implementation of Social Land Concession Program
8.
Design LD-SSP
9.
Prepare maps with areas of land available and suitable for
SLCs |
2.
As
above
3.
Prepare M&E Mechanisms for LDSSP |
GS-SLC
MLMUPC
GSSLC
MLMUPC |
GS-SLC
MLMUPC/SNCDD
MOI
GSSLC
Inter-ministerial TWG for Land,
identification, classification, and mapping for SLCs |
Dec 2011
June 2010
|
RGC
Germany
WB
Germany
World Bank
GSSLC |
Joint Monitoring Indicator 9:
Forestry |
Forest cover of country land
area will be maintained by increasing of quality and
quantity through better management of forest resources |
NFP implementation in the
planning and management of the forest sector improved |
Promotion of the NFP
implementation at both national and sub-national levels, at
least 75% of all funds to forest sector should be aligned to
NFP framework |
1.
Reforestation of 25,000 ha of degraded lands |
1.
Consolidate annual work plan to support the national and
sub-national level |
FA, MAFF
|
FA, private companies
|
18 months |
RGC, private companies
|
2.
750
Km of forest estate demarcated by FA, and 4 Protected Areas
demarcated by MoE |
FA, DPs, MAFF and local
authorities |
FA, NGO
|
RGC, DPs, NGOs |
3.
100
Community Forestry approved by MAFF and 7 Community
Protected Areas approved by MoE |
2.
Approval of mapping of two million ha CF areas of
forestland by MAFF |
FA, DPs, MAFF, MoE and local
authoritie |
FA, MAFF, MoE, NGO
|
|
RGC, DPs, NGOs |
4.
Cambodia REDD Readiness Road
Map approved and started implementation |
3.
Produce legal procedures and
legislations for REDD |
FA, MAFF, MoE DPs, NGO |
FA, MoE,
DPs |
RGC, DPs, NGOs |
Joint Monitoring Indicator 10:
Fisheries |
Fisheries plans in support of
food security, livelihoods and economic development improved |
Strategic planning process
developed and in use across the sector |
80% of SPF targets prioritized
for action in 2010 and 2011 implemented through FiA Annual
Plan |
1.
Final Khmer-language draft
completed by end of Q2, 2010 and SPF approved by end of Q4,
2010.
2.
All central-level action plans
implemented based on SPF targets by the end of Q3, 2011.
3.
Sub-national fisheries planning
processes implemented in line with SPF targets and National
Program for Sub-National Democratic Development in 4
provinces by the end of Q4, 2010. |
1.
Joint Task Force drafts and
agrees joint M&E processes for SPF implementation progress
monitoring by end of Q4, 2010.
2.
DPs
provide 80% of their fisheries development funding as
sector-wide programme-based support in line with SPF targets
by the end of Q3, 2011. |
TWGF |
FiA |
By the end of Nov 2011 |
RGC
FiA
DPs
TBI |
Joint Monitoring Indicator 11:
Mine Action |
Reduction in the number of
mine/ERW casualties and increased land released to support
to rural development |
Demining
resources are allocated to the most impacted areas |
1.
Number of casualties drops to
191 or less in 2011 from the level of 243* in
2009.
2.
Total cleared area increases
from 535.9* km2 by 2009 to 637.7 km2
by 2011.
3.
The use of cleared land for
agriculture purpose increases from 56% in 2009 to at least
60% in 2011 |
1.
Improve national capacities in
coordinating, planning and monitoring mine clearance plans
that take into account casualty rates and development
priorities;
2.
Promote the use of land release
methodologies;
3.
Complete Baseline Survey Phase
I and II (60 districts);
4.
Strengthen the provision of
risk education program to specific high risk groups. |
1.
Promote DPs’ alignment to
national mine action strategy;
2.
Promote the sign-up of
Partnership Principles among DPs;
3.
Sensitize DPs and demining
operators with the prioritization and planning process for
mine clearance.
Indicator:
a.
More projects and programs target high impact areas and the
use of land release methodologies is promoted.
b.
Enhance national capacities to lead policy dialogue, design,
monitor and evaluate projects and programs in support of the
NMAS.
Indicator:
A comprehensive capacity
development plan for CMAA is developed. |
CMAA |
CMAA
MOI
MOP
MPWT
MOSAVY
MRD
MAFF
MOE
MIME
MOEYS
National Police
RCAF
Demining operators
RE service |
Dec 2011 |
Gov’t and DPs |
Joint Monitoring Indicator 12:
Private Sector Development |
1.
Reduced lead time for import and export |
1.
Expand computerization of border trading processes |
1.
Share of Single Administrative Documents processed through
computerized system (baseline: 53% in early 2010; target:
over 80% by end of 2011) |
1.
GDCE’s ASYCUDA extension project and implementation of risk
management
2.
Implementation of Cross-Border Trade Agreements
3.
Automation of other trade-related processes (e.g.
certificates of origin) |
Coordination through Trade SWAp
and GDCE Strategic Plan |
GDCE
as lead agency
TWG
PSD and Sub-Steering Committee on Trade Development and
Trade-Related Investment |
GDCE
Other trade-related agencies |
All activities ongoing |
WB, EC/DANIDA/UNIDO, JICA, ADB |
2.
More efficient delivery of SPS-related services to private
sector traders |
2.
Clear delineation of responsibilities across government
agencies in charge of SPS measures |
2.
Agreements on delineation of responsibilities between all
SPS related ministries or agencies (MIME, CamControl, MAFF,
and MOH) signed and made operational (target: agreements
signed in 2011) |
4.
ADB-financed
analysis of legal framework FAO/SDTF review of legal
framework |
Coordination through Trade SWAp
|
SPS
interministerial committee
TWG
PSD and Sub-Steering Committee on Trade Development and
Trade-Related Investment |
MIME, CamControl, MAFF, and MOH |
All activities ongoing |
ADB,
SDTF/FAO |
NSDP-Update
Infrastructure Sector Priorities |
Joint Monitoring Indicator 13:
Infrastructure and Regional Integration |
Road maintenance is adequately
implemented |
Capacity of Ministry’s staff on
road maintenance is enhanced |
1.
To
effectively apply road maintenance tools & software in
preparation of annual & 3-year rolling plans and submit
plans to MEF by the end of 2011
2.
To
outsource 10 % of periodical road maintenance by the end of
2011 |
RAMP: 2010-2015 (5Y)
1.
To
build capacity of Road Asset Management Office and Road
Data Collection Management Unit to produce annual & 3-year
rolling plans
2.
To
build capacity of MPWT staff to manage private sector in
road maintenance management system |
Adequate coordination on the
capacity development for road and bridge construction
quality control. |
MPWT,
Land Transport sub-TWG |
MPWT |
Jun 2010 to Nov 2011 |
MPWT,
ADB, AusAID, IDA/WB, OPEC
(Road Asset
Management Project) |
3.
Standards, guidelines and regulations for Quality Control
are formulated, officially authorized and applied to force
account at least two pilot projects by the end of 2011 |
SCQCP: 2009-2012 (3.5Y)
3.
To
produce Road Maintenance Guidelines and Manuals and theirs
pilot project implementation in selected provinces |
MPWT, JICA (Strengthening of
Construction Quality Control Project |
Joint Monitoring Indicator 14:
Rural Water Supply, Sanitation and Hygiene |
Improved access to water
supply, sanitation and hygiene in rural areas
(From CMDGs) |
Consistent implementation of
national strategy on RWSS&H by government and DPs by Q1 2012 |
July 2010:
Hygiene education implementation guidelines;
Jan 2011:
Operation and Maintenance implementation guidelines;
July 2011: Water
supply surveillance implementation guidelines;
Jan 2012:
Monitoring and evaluation implementation guidelines |
Develop and implement all
identified national guidelines for sector strategy
implementation
(follow on from last JMI) |
Donor mapping completed for
RWSS sector, and joint sector planning process piloted (Dec
2010) |
MRD
TWG-RWSSH |
MRD
MRD
MRD
MRD |
July 2010
Jan 2011
July 2011
Jan 2012 |
RGC & DP
RGC & DP
RGC & DP
RGC & DP |
NSDP Governance and
Cross-Sectoral Priorities |
Joint Monitoring Indicator 15:
Public Administrative Reform |
Foundations to deepen and widen
the Administrative Reform in place |
1.
NPAR approved |
1.
Approved NPAR |
CAR Secretariat workplan for
2010 |
Capacity development of CAR
Secretariat and NPAR network of ministerial working groups |
CAR Secretariat
|
CAR
|
CDCF 2011 |
RGC & DPs Needed
|
2.
DP multi-years support programs
approved |
2.
Signed multi-year development
agreements |
3.
Review of HRM and HRD completed |
3.
HRM processes streamlined and
strengthened; |
4.
Approved policy framework on
HRD |
4.
Information base to review
compensation policy updated |
5.
Studies on labor market and
fiscal space completed; |
6.
Operational review guide
completed |
7.
OPS Review pilots completed |
8.
Options developed and approved
for sequencing compensation reform |
Joint Monitoring Indicator 16:
Legal and Judicial Reform |
Improved Court Functioning |
1.
Completion of fundamental laws pertaining to the judiciary
|
1.
Approval by the Council of Ministers of the fundamental laws
pertaining to the judiciary, being:
a). The Law on the
organization of the Courts,
b). The Statute on Judges and
Prosecutors, and
c). The Law on the Amendment of
the Organization and Functioning of the Supreme Council of
Magistracy |
1.
Review status and prioritize order of technical review for
the three drafts by CLJR.
2.
Drafts reviewed by special working group led by Council of
Jurists
3.
Submission of drafts to Inter-Ministerial Meeting (IMM)
4.
Adoption by COM.
|
1.
TA for technical review for
compliance with international standards, and
2.
DP assistance to ensure the
three draft laws are consistent with the substantive
Cambodian legislative framework and with RGC policy. |
TWG-LJR
|
COM
MOJ
|
End of 2011
|
|
2.
Implementation of the model court concept in 4 courts |
2.
Implementation of priority activities for 2011 including
functioning court registers for all 4 model courts |
5.
Completion of the 4 model court activity plans
6.
MoJ
and the 4 model courts agree on priority activities for
2011 & 2012
7.
Budget submissions for funding the plans in 2011 & 2012
prepared in the MEF required format |
3.
RGC
and DP funding to be made in line with Courts Strategic
Plans and activity
4.
Harmonization of development
partner support |
TWG-LJR |
MOJ |
End of the second quarter of
2011 |
RGC
DANIDA
AusAID
USAID |
Joint Monitoring Indicator 17:
Anti-Corruption |
Combat corruption |
|
|
1.
Establish an Anti-Corruption Institution within the period
of 6 months after the Anti-Corruption Law taken into effect.
2.
Educate and raise public awareness on the Anti-Corruption
Law, and disseminate information on Corruption cases to
general public.
3.
Develop practical measures for preventing corruption
4.
Implement Zero-tolerance principle on Corrupt Persons |
|
COM
ACU
ACU
ACU
|
|
|
|
Joint Monitoring Indicator 18:
Decentralization and De-concentration |
Public service delivery has
been brought closer to the citizens through
institutionalization of the Sub-National governance
structures and systems
|
Structures, Systems and
Operational Procedures of the SNAs have been appropriately
developed and modified based on the spirit of the Organic
Law and the principles of democratic development
|
1.
By
end of 2011, the personnel in the Sala Reach Theany,
Salakhet, Salakrong, Salasrok and Salakhan (about 10,000
personels) and in the 04 ExCom Units have been integrated
into the new structures with adequate capacity to perform
the given functions based on laws and other regulations
2.
The
increase of the Sub-National Budget in 2011 (from RGC budget
and DP budgets) |
1.
Develop and implement the 3 year-detailed- implementation
program;
2.
Study, exposure and integrate the structures and systems of
the ExCom into the structures and systems of the
sub-national administrations;
3.
Integrate the current personnel in the Sala Reach Theany,
Salakhet, Salakrong, Salasrok and Salakhan into the new
structures in accordance with the Law on Administrative
Management of Capital, Province, Municipality, District and
Khan with appropriate capacity development;
4.
Develop mechanisms to integrate and strengthen the capacity
of MoI’s departments, ministries and other institutions;
5.
Formulate key legal instruments to support the sub-national
administrative reform in accordance with the Organic Law;
6.
Law
on Su-National Financial Regime and Property Management
Passed |
1.
The
National Program’s first phase is to be initially
implemented with coordinated commitments among the DPs as
part of a PBA.
Indicator
Coordinated actions shall be
made among the DPs to assure for aid effectiveness.
2.
Program Based Approach (PBA) of
the National Program will serve as an opportunity for
strengthening aid effectiveness under RGC leadership.
Indicator
TWG on D&D (RGC and DPs)
developed PBA and
strengtened the interaction
between the DPs and RGC
through the regulrisation of the TWG on D&D meeting. |
RGC
TWG on D&D |
NCDD
DPs
|
18 months |
RGC and DPs
|
Joint Monitoring Indicator 19:
Public Financial Management |
Sustaining and strengthening
budget credibility
and improving financial
accountability
|
1.
Revenue policy, forecasting and
collection systems, transparency and capacity strengthened. |
1.
Progressive improvement in revenue yield compared to GDP by
0.5% per annum. |
1.
Finalize Revenue Policy Paper |
1.
Implementation of PFMRP is on-going and comprises an
important component of the overall contribution to aid
effectiveness ( PFMRP Consolidated Action Plan)
2.
Consultations and Program monitoring have been implemented
trough formal TWG meetings, Annual review Meetings.
|
MEF/PFM
Reform Steering Committee/PFM TWG |
MEF
and Line ministries /Institutions (39) |
2010-2011 |
Gov't
& DPs
(Multi-Donor Trust
Fund and Bilateral
Assistance) |
2.
Extractive Industry regulatory framework enacted and
implemented |
2.
Develop draft taxation law on oil and gas
|
3.
Enhanced transparency achieved with regards to tax and non
tax revenue. |
3.
Strengthen
Revenue forecasting, collection
systems, and capacity.
|
2.
Cash and Debt Management
Policy, Systems and Capacity strengthened. |
4.
Arrears as defined be kept at no more than 2% of total
expenditure |
4.
Further Improvements in
recording Payment Order due |
5.
Mid/end year expenditure profile not to be less than:
2nd Quarter: 45%
4th Quarter: 96% |
5.
Strengthen efficiency of existing semi-manual systems,
de-concentrate responsibility |
6.
Percentage of payments to creditors and staff made through
banking system to be not less than 80% by value. |
6.
Rationalize Bank Accounts and increase use of commercial
banking system |
3.
De-concentrated lines of
financial accountability established in key Line Ministries
|
7.
Establishment and application of clear rules for both
responsibility and empowerment for budget managers in key
Line Ministries. |
7.
Design new system of de-concentrated budget and financial
management roles and responsibilities (develop budget entity
and internal control procedure framework, deepen
classification reforms, and identify appropriate accounting
standard) and phase in implementation of new classification
code and accounting standards across Government while
piloting implementation of new budget entities and internal
control procedures in FMIS pilot Ministers. |
4.
Complete the designing of all To Be Business Process with
proper Change Management Strategy and Communication Plan in
Place to manage those changes and get MEF’s management
approval on all to be business process and Management
Support Mobilization |
8.
FMIS transaction accounting and internal control processes
developed.
|
8.
Develop Change Management Strategy and Communication Plan.
9.
Develop Change Management Sponsor Roadmap
10.
Design To be business processes and implement 1st
phase in MEF and FMIS pilot Ministries
11.
Apply the to be business processes to the FMIS System
Software |
5.
Minimum capacities established in key line ministries with
regards to skill set required for exercising of effective
accountability |
9.
Functional Review conducted and Training Programs delivered. |
12.
Undertake Functional Reviews of MEF and Line Ministry
Finance and Accounting operations and implement 1st
phase in MEF and FMIS pilot Ministries. |
13.
Develop Annual Training Program of MEF and LMs |
14.
Finalize and conduct professional training program
(Procurement, Accounting and Audit training and ICT) |
Joint Monitoring Indicator 20:
Gender |
Enhanced socio-economic
empowerment of women through improved access to quality
services and legal protection |
1.
Employment opportunities for women promoted including the
informal sector |
1.
Number of women benefiting from vocational training
opportunities
2.
Research results on economic opportunities and occupation
needs available and disseminated
3.
Mechanisms to promote economic opportunities for women
established |
1.
Advocate for relevant vocational training opportunities for
women.
2.
Research the needs and opportunities to improve economic
conditions of women and research occupation needs in the
context of the global economic crisis.
3.
Enhance partnership with government and private sector
including informal sector. |
Consultative process led by the
TWG-G Secretariat to identify concrete aid effectiveness
actions and priorities.
The actions will be drawn from
the 5 year strategic plan-the Neary Rattanak 3, the
TWG-action plan, and where relevant other multi-partner
action plans such as the National Action Plan to Combat
Violence against Women.
Priority actions already
identified include capacity assessment, donor resource
mapping, learning opportunities/ workshops for TWG-G
facilitated by CDC or external experts (Q3) and follow up on
the ongoing work on strengthening partnerships.
|
MOWA/
TWG-G |
MOWA
MOLVT
MOC and
MIME |
2010-2011 |
National budget (tbd)
JICA
ILO
IFC
NGOs (including
Oxfam
PYD etc) |
2.
Increase in quality social and
legal services for women victims of GBV and human
trafficking. |
4.
Number of qualified staff that work in relevant services
(social workers; lawyers/ paralegals; judicial officers)
5.
Total expenditures for relevant services.
6.
Survey on availability/ quality of services (as Follow-Up to
existing surveys)
|
4.
Research on victims referral mechanisms
5.
Advocate with relevant institutions to adhere to National
Quality Standards for Protection of Victims
6.
Advocate for effective rehabilitation and reintegration of
victims of human trafficking.
7.
Strengthen networks of relevant services and support the
establishment of systematic referral of victims.
8.
Support training for relevant staff.
9.
Increase funds for relevant services. |
MOWA/
TWG-G |
MOSAVY
MOJ
MOI |
2010-2011 |
National budget (tbd)
GTZ
UNIFEM
UNDP
UNFPA
TAF
IOM
CCJAP/
AUSAID NGOs |
3.
Law
enforcement officers increasingly performing their rights
and duties related to the prevention of GBV, including DV,
rape, sexual harassment and exploitation, and human
trafficking as well as the protection of victims |
7.
Number of administrative decisions of relevant local
authorities
8.
Number of protection orders issued by the courts.
9.
Number of convictions of perpetrators of sexual violence or
human trafficking
10. Number of cases of GBV,
rape, sexual exploitation and human trafficking |
10.Raise awareness on the role
of local authorities, police and the judiciary.
11.Train police and court staff
to respond to VAW and children, sexual exploitation and
human trafficking cases.
12.Improve accountability in
cases of non-performance and for illegal forms of
reconciliation. |
MOWA/
TWG-G |
MOWA,
MOJ, MOI |
2010-2011 |
National budget (tbd) TAF
UNICEF
UNIFEM
UNFPA
USAID
AUSAID
GTZ |
|
4.
A
coherent system to collect data and monitor the functioning
of legal protection mechanisms in cases of DV/GBV available |
11.A reference document on the
system for data collection and monitoring of DV/GBV
(guideline or similar) is defined and has been approved by
relevant governmental institutions
12.Data collection and
monitoring is part of the Action Plans of all relevant
government institutions
13.Relevant NGOs have
participated in the development of the data collection
/monitoring system |
13.Collect up-to-date
information on existing data collection/monitoring
mechanisms.
14.Raise awareness/ train
relevant officials on international standards of monitoring.
15.Develop a draft concept/
guidelines/ recommendations for monitoring and data
collection in this sector.
|
MOWA/
TWG-G |
MOI,
MOH, MOJ and courts, MOSAVY |
2010-2011 |
National budget (tbd) UNIFEM
UNDP
UNFPA
GTZ
and NGOs |